Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
3% of nearby decided applications were refused. The site check found 96 decisions within 5 km, 3 exact-site or onsite candidate records, and 2 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched1 of 2 layers are loaded for Clare County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Clare County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Clare County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2 structured nearby appeal records.
2 matchedNo current-dated citation is loaded for Clare County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
For (a) to demolish existing extension and shed to rear of existing dwelling house and (b) to construct a new extension and garage to the rear of this dwelling including alterations to the dwelling house, new sewage treatment system and ancillary works
To demolish part of the existing dwelling house and the existing shed and to construct an extension to the rear of the dwelling house along with all associated site works and services, to include a new wastewater treatment system
To a). construct a single-storey extension to the side and rear of existing dwelling house, including an astro turf play area to rear of extension, and new private garage; b). demolish the existing private garage; c). close off existing front site entrance and create new site entrance from side road; d). upgrade existing wastewater treatment system; e). provide new stone wall boundary treatment along main and side road frontage; f). all associated site works and services; and RETENTION permission for demolished cottage on site
To RETAIN as constructed porch to the front of the dwelling house
To construct an agricultural machinery shed along with associated site works
To construct an agricultural machinery shed along with associated site works
The brief summarizes the pattern across all 96 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 18944The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief