Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 417 decisions within 5 km, 1 exact-site or onsite candidate record, and 37 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
37 structured nearby appeal records.
37 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The proposed development will consist of demolition of existing industrial buildings on site and (a) construction of 23 new dwelling houses comprising of: 2 no. 2 storey 2 bedroom semi-detached units and 21 no. 2 storey 2 bedroom terrace units (b) the proposed development also includes public realm landscaping including shared public open space and public lighting (c) provision of all associated surface water and foul drainage services and connections ancillary to the residential development (d) a new pedestrian and vehicular access from Richmond street and a new pedestrian and vehicular access from Sandy Row/Anally Park as well as all associated site development works and services
The construction of: (1) a 1,241.25m2, three storey community health facility (comprising consultation spaces, meeting rooms, offices and support spaces); (2) 47 no. parking spaces including 39 no. standard car parking bays, 3 no. disabled parking bays, 5 no. electric vehicle charging bays, as well as associated internal circulation roadway, and drop-off bay; (3) a portion of a new vehicular access link road from Connaught Road northward towards Little Water Street, extending as far as the proposed new site entrance; (4) All associated site development works to serve the proposal including site lighting, hard and soft landscaping, and all associated signage. The significant further information relates to Road Design and Environmental matters, including revisions to the proposed link road and internal car parking layout; a revision to the development site boundary to allow for kerbing construction on the western side of the proposed link road junction and for footpaths tying into existing footpaths to the west; the inclusion of an external covered bin store; revisions to the proposed building position with an increased setback from Connaught Road; a Stage 1 Road Safety Audit; details of proposed public lighting; proposals and details for the relocation of existing ESB services; an Outline Construction and Environmental Management Plan (CEMP); a Preliminary Contamination risk Assessment; and Stage 1 Screening for Appropriate Assessment accompanied by a Natura Impact Statement (NIS)
Of 17/148 - amendments to previously permitted single storey licensed convenience discount retail unit development (granted planning permission under Reg. Ref. 15/222; ABP Ref. PL 14.247105). The proposed amendments shall consist of revised site boundaries, relocation of the previously permitted single storey licensed convenience discount retail unit on the site including relocation of external plant area and associated revised elevations, reconfiguration of the car parking layout including an increase in the number of car parking spaces from 79 no. spaces to 80 no. spaces and all associated landscaping, boundary treatment, lighting, engineering and site development works necessary to facilitate the development
A) demolition of existing derelict dwelling house, car garage and ancillary buildings, b) construction of 4 no. 2 storey buildings to include 8 no. 2 bedroom and 8 no. 1 bedroom apartments with independent access to each unit, c) new pedestrian and vehicle access, d) provision of green open space & garden areas, boundary fences/walls with internal pedestrian pathways, e) connection to public services with sewer and water supply and all associated ancillary site works
Proposed decommissioning of existing 2 no. vehicular entrances/exits together with the proposed construction of 1 no. vehicular entrance/exit together with 1 no. pedestrian entrance to service existing car park which services The Longford Arms Hotel. Full planning permission is also being sought for the proposed construction of a new boundary wall along the northern boundary of the above mentioned car park and all ancillary works. The proposed development as described above relates to a Protected Structure as it falls within the curtilage of The Longford Arms Hotel – A Protected Structure (No. 125) as referenced in the Longford Town Local Area Plan 2009-2015 and transposed to the Current Longford County Development Plan 2015-2021
Proposed change of use of existing ground floor unit formerly known as The Tangled Web into office space and all ancillary works at the ground floor unit
The brief summarizes the pattern across all 417 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 19292The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief