Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
2% of nearby decided applications were refused. The site check found 110 decisions within 5 km, 1 exact-site or onsite candidate record, and 2 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2 structured nearby appeal records.
2 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Development consisting of retention of first floor extension, as constructed to south elevation of existing dwelling
For development consisting of the upgrade of an existing farm entrance to a forest access road entrance
For development consisting of (1) construction of a 21.5 sq.m extension to the west side of existing dwelling. (2) retain 2 sheds ancillary to the dwelling each measures 25 sq.m in floor area and all associated siteworks
For development consisting of the construction of a extension to existing dwelling house complete with on-site sewage treatment system, associated percolation area, hard and soft landscaping and all other associated site works
The proposed development will consist of the following a roofed manure pit, a 5 bay loose shed & an underground effluent storage tank along with all associated site works. There will be two buildings and one concrete effluent tank. All effluent from the loose shed will be collected and stored in the proposed effluent tank while the manure pit floor will be sloped towards the back wall to collect all effluent as per DAFM specifications. The loose shed will be 6.38m in height and the roofed manure pit will be 4.87m in height. All structures are to be constructed in an existing farmyard our clients family have been farming for years. There is no protected structures close to the site or watercourses.
Development consisting of the construction of a new 3 bay slatted shed together with all ancillary site works and services
The brief summarizes the pattern across all 110 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 19416The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief