Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 1,759 decisions within 5 km, 4 exact-site or onsite candidate records, and 113 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
113 structured nearby appeal records.
113 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To decommission, remove and reinstate the existing below ground District Regulating Installation and Install a new above ground 0.50 x 0.87 x 1.62 (IxWxH) enclosure to house a natural gas District Regulating Installation including a 3m high 'lamp post' style relief vent stack with all ancillary works
For retention permission for a single storey rear extension and all associated site works at
For the following: A-internal alterations to the existing building including new windows throughout, B- the demolition of the existing front porch and the construction of a new flat roofed porch of area 8.00sqm with canopy and ramped access in lieu C-the construction of a 60sqm single storey pitched roofed extension to the rear of their property including new side entrance, steel framed canopy and wheelchair accessible ramp. D-New blockwork wall and timber gate to new bin store and external boiler to the side of the new extension. All with the associated site development works
For the construction of a single-storey extension to our existing school building comprising of 4 no. additional classrooms with associated teaching spaces, toilet and shower / changing areas, multi-activity room and office, plant room and services compound, and the installation of solar photovoltaic panels to new roof area, in addition to adjustment / relocation of existing external hard and soft play areas and existing ball-court, the formation of new soft-play areas, new sensory garden, new hard and soft landscaping, 16 no. new carparking spaces (including provision for electric vehicle charging locations and 1 no. new disabled carparking space), new on-site road crossing on internal road network and extension to existing on-site drop-off area / lay-by and extension to associated drop-off canopy, complete with all necessary alterations to accommodate the works including the formation of a temporary contractor entrance to the south-western corner of the site and reinstatement of existing wall and fence upon completion of the works, and all associated site works and ancillary accommodation
For two storey extension to rear and alterations to front elevation of property
Ground floor front porch, ground floor lean to roof to front elevation. First floor accommodation containing bedroom, bathroom & storage and pitched roof, to the existing front & rear elevation,together with all ancillary and associated site works
The brief summarizes the pattern across all 1,759 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 19565The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief