Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 162 decisions within 5 km, 4 exact-site or onsite candidate records, and 3 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
3 structured nearby appeal records.
3 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission for a three phase overhead line connection (150m long) from an existing ESB pole to the new ESB substation including all associated site works
For a three phase overhead line connection (150m long) including all associated site works, from an existing ESB pole to a new ESB substation, granted under Planning Reference PD 16/623
Construction of (i) Potato storage shed (ii) Potato grading/processing shed (iii) Concrete yard and all associated site works
Construct/extend wing wall at existing entrance and associated works
Upgrades to the existing Kilsheelan Wastewater Treatment Plant comprising new inlet works; decommissioning the existing Storm Water Overflow (SWO); an upgrade of existing secondary treatment process; upsizing of sections of the inlet and outlet pipes; a new interprocess pumping station; a new storm water management system, including a storm tank and associated infrastructure; provision of a new above ground sludge storage tank; a new gravity pipeline; the decommissioning and demolishing the existing septic tank currently serving the Poll an Choire estate; material widening of an existing entrance and a new access road; an upgrade of the existing control building, which will include a rainwater harvesting system; the construction of a new welfare building; Ancillary Mechanical Electrical Instrumentation Control and Automation (MEICA) works; the relocation of some existing infrastructure; the installation of a ground mounted solar photovoltaic (PV) array and associated ancillary works including siteworks. (A Natura Impact Statement (NIS) has been prepared for the proposed development, and an application will be submitted to the Environmental Protection Agency for a revision of the current Wastewater Discharge Licence
A.) single storey pitched roof extension to rear; B.) single storey mono-pitched roof extension to side with front and rear access; C.) increased wall height of southern site boundary wall
The brief summarizes the pattern across all 162 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 19742The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief