Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
15% of nearby decided applications were refused. The site check found 79 decisions within 5 km, 5 exact-site or onsite candidate records, and 10 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
10 structured nearby appeal records.
10 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(A) DEMOLISH EXISTING DWELLING HOUSE AND OUTBUILDINGS, (B) CONSTRUCT NEW DWELLING HOUSE WITH ATTACHED GARAGE AND ALL ASSOCIATED SITE WORKS, (C) PERMISSION TO CONSTRUCT A NEW VEHICULAR ENTRANCE AND ALL ASSOCIATED SITE WORKS
Permission for development to: (A) Demolish the existing dwelling house and two sheds including sections of the roadside wall. (B) Construct a new dwelling house, attached garage, dependent relative accommodation and sections of the roadside wall at new locations, including all necessary site works and connecting to existing sewerage, surface water, mains water, etc, services
(A) RETAN THE EXISTING SHORT TERM STAY CAMPING SITE WITHIN REVISED SITE BOUNDARIES (B) RETAIN THE ALTERATION AND RENOVATION WORKS TO THE EXISTING TOILETS AND SITE AS CONSTRUCTED (C) PLANNING PERMISSION TO CONSTRUCT AN EXTENSION TO THE EXISTING TOILETS INCLUDING ALTERATIONS TO THE EXISTING TOILETS (D) PERMISSION TO CONSTRUCT A CAMPING SITE RECEPTION BUILDING WHICH WILL CONTAIN THE RECEPTION, CAMPSITE SHOP, STAFF ROOMS AND ASSOCIATED ROOMS. (E) PERMISSION TO EXTEND THE CAMP SITE WITH ACCES TO SAME INCLUDING ALL NECESSARY LANDSCAPING AND SITE WORKS (F) PERMISSION TO CONSTRUCT A WASTEWATER TREATMENT TANK WITH PURAFLO MODULES AND POLISHING FILTER INCLUDING DECOMMISSIONING THE EXISTING SEPTIC TANK. AN NIS HAS BEEN SUBMITTED IN SUPPORT OF THIS APPLICATION
RETAIN STORAGE SHED BUILDING AS CONSTRUCTED ON SITE AND TO RETAIN BALCONY WINDOW TO SIDE OF GUEST HOUSE ON SITE AND FULL PERMISSION TO CONSTRUCT A SINGLE STOREY EXTENSION TO THE FRONT AND SIDE ( SOUTHWESTERN AND NORTH- WESTERN ELEVATIONS) OF GUEST HOUSE ON SITE THUS CREATING SUNROOMS OFF THE EXISTING ROOMS AND INCLUDING ALL ASSOCIATED SITE WORKS AND PERMISSION TO UPGRADE WITH WASTEWATER TREATMENT SYSTEM ON SITE TO INCLUDE THE INSTALLATION OF A NEW SAND POLISHING FILTER
CARRY OUT ALTERATIONS TO THE ELEVATIONS OF HOUSES, 1, 4, 7, 8 AND 9
TO CARRY OUT ALTERATIONS TO THE ELEVATIONS OF HOUSE 2, 3, 4, 5 AND 6
The brief summarizes the pattern across all 79 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 19945The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief