Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 736 decisions within 5 km, 1 exact-site or onsite candidate record, and 45 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Kilkenny County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Kilkenny County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Kilkenny County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
45 structured nearby appeal records.
45 matchedNo current-dated citation is loaded for Kilkenny County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
For a development. Proposed Change of use of the existing equestrian events & conference centre to light industrial unit for dry foods processing & packaging. i. Proposed internal changes and reconfigured internal building layout. ii. Proposed external changes - 4 No. new pedestrian fire exits, 2 No. new level loading docks with pest proof roller shutter doors, 2 No. New AOV's blocking up of 1 No. arena doorway. Provision of new pest proof roller shutter doors to existing large arena doors. Provision of 2 No. new flues. Reconfiguration of existing surface car park to provide for 20 no. spaces & 3 no. Disabled spaces. iii. Proposed retention of a small side extension (29m2). iv. Proposed internal mezzanine (36m2) and all associated site works
(Ref No of Outline Permission P18/836) to build a two storey dwelling sharing existing entrance, install waste water treatment system and associated works
To build a two storey dwelling sharing existing entrance, install waste water treatment system and associated works
To retain: (a) 1 No detached single storey habitable dwelling including treatment system and percolation area, (b) 1 No detached single storey shed, including all associated site works
(a) 1 No detached single storey habitable dwelling including treatment system and percolation area, (b) 1 No detached single storey shed, including all associated site works
(1) a detached single storey habitable dwelling and all associated site works (2) a detached single storey stable building including all associated site works and (3) Planning Permission for a single storey extension to the side and rear of the existing habitable dwelling including a new wastewater treatment system and percolation area and all associated site works (4) modifications to the existing site entrance and (5) relocation of the existing wastewater treatment system and percolation area
The brief summarizes the pattern across all 736 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 19954The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief