Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
17% of nearby decided applications were refused. The site check found 851 decisions within 5 km, 1 exact-site or onsite candidate record, and 85 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
85 structured nearby appeal records.
85 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(1) Construction of 1 no. two–storey five-bedroom farmhouse (including farm / home office) with adjoining single storey garage connected via single–storey bootroom to be served by 1 no. new vehicular access from Lovers Lane / Ardrass Road, proprietary wastewater treatment system / percolation area and private bored well ( potable water supply): (2) construction of farmyard complex with associated farm access roads to serve overall livestock farm of 62.33 hectares (154 acres) comprising; (a) 1 no. cubicle shed with loose bedding area for the housing of cattle, storage area and underground effluent tanks with solar panels provided on the southern roof elevation of the building; and (b) 1 no. concrete apron incorporating 2 no. silage pits; (3) construction of 1 no. 16m wind turbine; and (4) all ancillary works necessary to facilitate the development include SuDS water drainage, landscaping and boundary works
A bridge over the River Liffey to facilitate farming. The bridge will consist of 3 spans of 30.1m, 8.3m and 28.4m for a total length of 66.8m (including supporting trusses), a deck width of 2.75m (6.35m structural frame) and it will be supported by 4 no. abutment walls. It will contain raillings on either side which will measure 2.26m high and have a structural depth of 2.5m. All associated site works including gravel access ramps
Construction of a single storey bungalow, secondary effluent treatment system, utilisation of existing family recessed entrance, detached single storey domestic garage and all associated site works
Façade amendments to existing single storey detached house as constructed and all associated site works
The construction of a single storey dwelling with a floor area of 210.0sqm; (b) A single storey garage with a floor area of 28.8sqm to be used for domestic purposes only; (c) The upgrading of the existing agricultural entrance to serve the proposed new dwelling; and (d) All associated site development works including connection into the existing public mains sewer and public mains water
For the removal of existing roof of existing single storey detached bungalow with a new higher replacement roof, demolition of existing single storey extensions (side and rear) to existing bungalow, permission to construct a one and half storey and two storey extension to the side and rear of existing bungalow, replacement of existing septic tank with secondary effluent treatment system, relocation of existing entrance and all associated site works
The brief summarizes the pattern across all 851 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 19971The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief