Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
30% of nearby decided applications were refused. The site check found 60 decisions within 5 km, 2 exact-site or onsite candidate records, and 3 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
3 structured nearby appeal records.
3 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission for development that will consist of the following: (1) Construction of 2no. warehouses, new access from the R132 road & existing Centrepoint Business Park to the south, attenuation pond, waste water treatment plant, raising ground levels of the entire site and all associated site development works including landscaping and boundary treatments. (2) On-site wastewater treatment plant, pumping station and rising main pipeline with outfall connecting to the Flurry River at Flurry Bridge. (3) Provision of drinking water treatment plant with connection to new potable water well located on adjacent site and associated pipework across private/public roads. (4) Associated access roads to/ from the Dundalk/Newry R938, miscellaneous internal roads, parking area, hard & soft landscaping, public lighting and all associated site development works
Permission to consist of change of use of building (referenced A on Site Plan), from ancillary storage to general storage with trade counter and subdivided into four units. Retention of vehicle parking and sales area referenced E. Retention of storage compounds F1, F4 and F5. Retention of structures J2, J3 and J4. Permission to demolish buildings H1 and H2 and re-build buildings (referenced as K1 and K2) with modern construction for general storage.
Permission for refurbishment of, and extensions to existing vernacular building to provide dwelling, to include wastewater treatment system and all associated site development works
Permission for refurbishment of and extensions to existing building to provide dwelling, to include waste water treatment system and all associated site development works
Permission for a new two storey dwelling house, waste water treatment system and all associated site development works
Retention permission for 1. The restoration of an existing dwelling house to include for alterations to the front porch. 2. The conversion to habitable accommodation of an attached farm building to form part of the dwelling house. 3. The conversion and alterations of an outbuilding to dependent relative accommodation at ground floor level and a home office/games room at first floor level. 4. A new waste water treatment system and 5. all associated site development works *Significant Further Information Received on 30/04/2025 - omission of the proposal to convert the ground floor of the detached outbuilding to dependent relative accommodation and replacement with alternative proposal to convert the ground floor of the detached outbuilding to storage areas*
The brief summarizes the pattern across all 60 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 201001The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief