Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 2,109 decisions within 5 km, 5 exact-site or onsite candidate records, and 381 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matched1 of 2 layers are loaded for Kildare County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedOne current citation from the Kildare County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Kildare County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
381 structured nearby appeal records.
381 matchedCitations are current-dated and carry policy name, section, page and source URL from the Kildare County Council development plan.
1 matchedOpen preview
Open preview
The extension of an existing telecommunications lattice tower (providing new overall height of 21.5 metres), carrying existing antennas, dishes and associated equipment and additional antennas, dishes and associated equipment, together with new ground equipment cabinets, new fencing and all associated site development works at the Eir Exchange. Revised by Significant Further Information which consists of an amendment to the red line boundary
Renovation, alterations, attic conversion, a replacement single-storey extension to the existing house, and all associated site work
Construction of a detached four bedroom dormer bungalow to side of existing house, together with associated siteworks and alterations to entrance to existing house
Change of use of existing retail unit to food takeaway and amendments to trademark signage to front of unit and external extract ductwork extending 4.5m to the rear of the site and associated ancillary works
For the proposed extension of his existing house: 1) The removal of an existing shed in the rear garden to facilitate the construction of a new ground floor extension to the side and rear of the existing house; to accommodate; porch, living space, boot room, and dining, 2) New extension roof to accommodate rooflights, 3) Modification of existing main roof structure to include; new dormer window to the front, with rooflight and new dormer window to the rear (attic space not to be converted, to remain as dry storage space only), 4) Internal modifications and all associated site works
Will consist of: Single-storey front porch. Garage conversion for an extra bedroom. With a new front window. Raised roof on side extension. Single -storey extension to the rear. Roof window in front porch
The brief summarizes the pattern across all 2,109 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 20869The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief