Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
31% of nearby decided applications were refused. The site check found 230 decisions within 5 km, 5 exact-site or onsite candidate records, and 9 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
9 structured nearby appeal records.
9 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For: 1. the construction of a dwelling house, garage and wastewater treatment system and 2. retention of groundworks. Gross floor space of proposed works: House: 123.51 sqm, Garage: 60 sqm.
For: 1. the construction of a dwelling house, garage and wastewater treatment system and 2. Retention of groundworks in the townland of Carrowroe North. Gross floor space of proposed works: 123.51sqm (House) & 60sqm (Garage)
For: 1. the construction of a dwellinghouse, garage and wastewater treatment system and 2. Retention of groundworks. Gross floor space of proposed works: 123.51 sqm (h) & 60.00 sqm (G)
For 1. the construction of a dwellinghouse, garage and wastewater treatment system and 2. Retention of groundworks. Gross floor space of proposed works: 123.51 sqm (house) and 60.00 sqm (garage)
For: 1. the construction of a dwellinghouse, garage and wastewater treatment system and 2. retention of groundworks. Gross floor space of proposed works: House - 123.51 sqm, Garage - 60.00 sqm
To construct a new dwelling house, garage, on site wastewater treatment unit/ percolation area and all associated site works. Gross floor space of proposed works: 241.65 sqm (house) & 50.77 sqm (garage)
The brief summarizes the pattern across all 230 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 20946The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief