Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 272 decisions within 5 km, 3 exact-site or onsite candidate records, and 11 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
11 structured nearby appeal records.
11 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Outline Planning permission for the construction of a single storey dwelling, effluent treatment system and percolation area, vehicular entrance and all associated site works
For the construction of a single storey dwelling, effluent treatment system & percolation area, vehicular entrance & all associated site works
To construct a new bungalow, proprietary waste water treatment unit with filter bed, recessed entrance, with all associated site works, to relocate borewell and to demolish existing disused cottage
Retention for existing kitchen extension, development of a domestic garage/hobby shed, and all associated site works. PERMISSION for Refurbishment to an existing cottage, including; Demolition of front porch and bathroom extension, upgrade of wastewater treatment system
The construction of a new single storey house, a garage, a waste water treatment system, a bored well and an entrance along with al associated site works
Permission for 211m of site track.
The brief summarizes the pattern across all 272 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 211135The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief