Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
3% of nearby decided applications were refused. The site check found 213 decisions within 5 km, 1 exact-site or onsite candidate record, and 3 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Cavan County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Cavan County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Cavan County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
3 structured nearby appeal records.
3 matchedNo current-dated citation is loaded for Cavan County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
To retain (a) change of floor plans and elevations of previously approved detached domestic garage, (b) change of use from storage space to living accommodation at first floor level of detached domestic garage and all associated works and siteworks
To (a) demolish existing disused agricultural building (b) construct a single storey style dwelling, (c) form new entrance onto public road (d) construct detached domestic garage, (e) install proprietary wastewater sewage treatment system and percolation area (f) together with all associated site works
To (1) construct a single storey extension to side of existing two storey dwelling to incorporate bedroom and sanitary accommodation, (2) amend existing window opening to existing side elevation and (3) complete all associated works and ancillary site works
For the demolition of existing outbuilding to side of existing dwelling, construction of a single storey extension to rear of existing detached dwelling, internal alterations, new vehicular entrance onto public roadway, driveway, waste water treatment system, percolation area, landscaping and associated site works
For (1) Construction of an agricultural shed to incorporate loose bedded calf accommodation, slatted area, feed passage area and underground effluent storage channel, (2) Completion of all associated and ancillary site works
To construct a single storey detached replacement dwelling, demolition of existing storey & half detached dwelling, storage shed and barn, existing entrance onto existing lane, waste water treatment system and soil polishing filter, landscaping and all associated site works
The brief summarizes the pattern across all 213 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 21746The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief