Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 110 decisions within 5 km, 1 exact-site or onsite candidate record, and 3 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
3 structured nearby appeal records.
3 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
CONSTRUCTION OF AN EXTENSION TO EXISTING HOUSE, INCLUDING DEMOLITION OF EXISTING REAR BATHROOM, MINOR ALTERATIONS TO EXISTING DWELLING, PROPOSED BOUNDARY TREATMENTS AND ALL ASSOCIATED SITE WORKS AND DRAINAGE
THE CONSTRUCTION OF A DWELLING HOUSE, DOMESTIC GARAGE, SEPTIC TANK, PERCOLATION AREA, NEW ENTRANCE AND ASSOCIATED SITEWORKS
A NEW TWO STOREY DWELLING, NEW SITE ENTRANCE, SEPTIC TANK, PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS
DEMOLITION OF EXISTING DWELLING HOUSE AND BUILD NEW DWELLING HOUSE, INSTALL SEPTIC TANK WITH PERCOLATION AREA AND ALL ANCILLARY SITE WORKS. THIS DEVELOPMENT IS WITHIN THE CURTILAGE OF A PROTECTED STRUCTURE LISTED UNDER THE RECORD OF PROTECTED STRUCTURES IN THE OFFALY COUNTY COUNCIL DEVELOPMENT PLAN (REF. NO. 11-004)
(RED III) the installation of a heat pump and a 2000l LPG tank as part of school decarbonisation project under a Renewable Energy Directive III (RED III) Development
CONSTRUCTION OF 2 NO. ASD CLASSROOM UNITS AND TEACHING AND RESOURCE ROOMS TO THE SIDE AND REAR OF EXISTING SCHOOL AND ALL ASSOCIATED SITE WORKS AND SERVICES
The brief summarizes the pattern across all 110 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 21803The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief