Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
15% of nearby decided applications were refused. The site check found 358 decisions within 5 km, 5 exact-site or onsite candidate records, and 37 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matched1 of 2 layers are loaded for Kildare County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedOne current citation from the Kildare County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Kildare County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
37 structured nearby appeal records.
37 matchedCitations are current-dated and carry policy name, section, page and source URL from the Kildare County Council development plan.
1 matchedOpen preview
Open preview
The development will consist of retention of conversion of domestic garage to single storey granny flat including kitchen/living room, bedroom and shower unit, also permission to construct access corridor to join to side of existing single storey dwelling also permission to upgraded wastewater treatment system with Tertiary Treatment System and infiltration/treatment area plant and all other associated site development works
A) Amendment of Condition No2(b) of Planning File Ref 92/786 to remove sterilisation of a portion of the land to allow for the erection of the proposed house, b) proposed new single storey dwelling, c) new vehicle entrance, d) domestic garage, e) treatment system & percolation area along with all associated site development and facilitating works
For a) proposed new single storey dwelling, b) new vehicle entrance, c) domestic garage, d) treatment system & percolation area along with all associated site development and facilitating works
1. Single storey extension to rear to provide new dining and living rooms. 2. Associated internal and external alterations to the existing cottage including additional window openings, replacement doors, replacement roof finish and replace existing masonary chimney with replacement metal flue. 3). Replacement of existing septic tank with new waste water treatment system and polishing filter. Upgrading of storm water drainage system. 4. Associated external groundworks and adjustment of existing boundary treatments to improve privacy and amenity
For a detached bungalow, on site effluent treatment system & percolation area, surface water to soakaways, stable block comprising of 3 no. stables, barn/fodder store structure, recessed entrance and all associated site works
A 10 year planning permission for the construction of: 1. An enclosed battery energy storage system compound on c. 4.089 ha with 76 no. battery storage units (each with associated containerised step-up transformer), 1 no. containerised control room and 1 no. containerised switch room, 1 no. containerised switchgear unit and CCTV cameras; 2. new site entrance off the L6044 and site access road; 3. site access road extension to a proposed substation site (proposed substation currently subject of a Strategic Infrastructure Development Pre-Application Consultation with An Bord Pleanála); and 4. all associated ancillary development works. The operational lifespan of the battery energy storage system will be 35 years. All
The brief summarizes the pattern across all 358 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 21963The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief