Applications tied to the site
Partial coverage6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
16% of nearby decided applications were refused. The site check found 2,192 decisions within 5 km, 6 exact-site or onsite candidate records, and 229 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
229 structured nearby appeal records.
229 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission for development which consists of the construction of a new ESB Substation and transformer compound, modifications to the existing utility buildings, and associated site works to the rear of Building 1
Permission for development which consists of the construction of a new transformer compound, modifications to existing utility buildings, and associated site works, to the rear of Building 1
Permission for development which consists of: construction of 2 No. individual units in a single block (Total Area- 230sq.m) for use as warehousing /storage, distribution, retail of a type and scale appropriate to the area, offices /specialist offices, light industry, and all other uses compatible with CI Zoned lands along with all ancillary site works and site services to the South of Block D, Glenrock Business Park, Bothar na Mine, Galway
Planning permission for the development which will consist of works to building 2, MOD 1 comprising the construction of a single-storey extension ( 91m2) to canteen area in the north elevation, fire escape staircase and installation of a rooflight, minor modifications to a previously granted compactor yard and minor site alterations
Planning permission for the development which will consist of works to Building 2 MOD 3 comprising: the construction of new floor area (540m2) at first floor level to be used as lab/ office space with 2 no. access stairs and a lift, all within the existing building, alterations to part of the south façade and the installation of rooflights in the existing roof.
Permission for development which consists of the construction of a roof-mounted platform, air-handling unit and associated ductwork on the roof of building 1
The brief summarizes the pattern across all 2,192 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 22306The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief