Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 630 decisions within 5 km, 2 exact-site or onsite candidate records, and 36 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
36 structured nearby appeal records.
36 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To extend the residential development known as Bramble Lane as follows: (1) demolish all existing partially built dwellings, (2) erect 45 no. fully serviced dwellings as follows: (a) 13 no. 2 storey 3 bed semi detached and terraced dwellings, (b) 28 no. 2 storey 2bed semi detached and terraced dwellings, (c) 4 no. 2 storey 1 bed terraced dwellings, and (3) associated service road, site boundaries, open space and all associated site works. Previously granted under approved permission 06/1032
To carry out alterations to previously approved PL. Ref. No. 22/440 as follows: 1) alterations to previously approved house numbers 1, 19, 23, 31, 32, comprising of minor alterations to plans & elevations. 2) change block comprising of units 9, 10, 11, 12, 13 (previously 2no. 1 bed duplex units and 1no. 2 bed, two storey unit) to 3no. 2 bed, two storey townhouse block. 3) associated alterations to site layout and all ancillary and associated works
To (1) retain porch canopies to front elevation of house types D,G & I. (2) Retain replacement of lounge bay window with standard window to side of house type H. (3) retain landing window to front elevation of house types G & I. (4) Retain landing window to side elevation of house type F. (5) Retain en-suite window to side elevation of house type D. (6) Retain mirrored floor plans & elevations to house type D on site no's 28, 43, 44, & 51 Bramble Rise. (7) Retain Replacement of house type E with house type L as constructed with alterations to site boundaries. (8) Retain mirrored floor plans & elevations to house type L as constructed on site no's 57,58,59 & 60 Bramble Avenue. (9) Retain amended floor plans and elevations to house type J & K as constructed on site no's 13,14,15, 61, 62 & 63 Bramble Avenue. (10) Retain replacement of house type F & G (Town Houses) with N & P (Semi Detached) as constructed on sites no's 5,6,7,8,9,10,11 & 12 Bramble Avenue. And all ancillary site works (previously granted under approved permissions 04/898 & 06/942). This application relates to 55 no. houses in total
To retain existing first floor mezzanine, entrance porch and all associated alterations to existing Cavan Hire Unit
For the installation of a modular substation and ancillary site development works; to facilitate 2 no. shared electric vehicle charging units and 4 no. charging bays and ancillary site works within a partially reconfigured parking area
For change of use for part of retail unit from retail to retail and ancillary Off-licence area
The brief summarizes the pattern across all 630 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 22440The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief