Applications tied to the site
Partial coverage7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
3% of nearby decided applications were refused. The site check found 180 decisions within 5 km, 7 exact-site or onsite candidate records, and 1 structured appeal.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matched1 of 2 layers are loaded for Cavan County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Cavan County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Cavan County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1 structured nearby appeal record.
1 matchedNo current-dated citation is loaded for Cavan County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
To erect 1 no. fully serviced single storey 'A' pitched storage unit attached to rear of existing factory - area 1520sqm, finished in matching materials to existing factory and the RETENTION of 410sqm extension to existing storage unit granted under planning reg. no. 11/122 to the rear of existing factory and all ancillary site works. Significant further information and revised plans have been submitted.
Erect 1 no. fully serviced single storey flat roof ESB sub-station to the rear of existing factory and all ancillary site works
Of: (1) Alterations to previously approved Unit 1 (Planning Ref: 05/144), including alterations to internal warehouse layouts and elevations, additional office space, additional 2 storey extension to front of unit, additional single storey lean-to to side of existing unit and signage to front elevation, (2) Alterations to previously approved Unit 2 (Planning Ref: 17/76), including additional floor area of unit and alterations to internal layout, associated alterations to elevations and a 2 storey office area, (3) ESB Kiosk, external plant, gas compound, delivery dock and mobile office, (4)Alterations to previously approved site plans and all ancillary site works
For the erection of a part two storey, part single storey dwelling house with attached domestic garage, entrance gates and piers, connection to public services and all associated site works
For an extension to the existing National School to include 1 classroom, 2 S.A.T rooms and associated ancillary spaces, addition of on-site parking, upgrade works to outdoor play areas including the addition of astro turf play area with perimeter fencing, boundary treatments and all ancillary works
Of: 1 two storey community office building, 1 single storey communal mans shed workshop, new site access from existing car park and all ancillary site works
The brief summarizes the pattern across all 180 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2249The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief