Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
27% of nearby decided applications were refused. The site check found 112 decisions within 5 km, 5 exact-site or onsite candidate records, and 4 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matched1 of 2 layers are loaded for Louth County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Louth County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Louth County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
4 structured nearby appeal records.
4 matchedNo current-dated citation is loaded for Louth County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Permission for a 3 storey extension to north side of existing bedroom block comprising 18No bedrooms (6No bedrooms on each floor) & new emergency staircase; extension to south side of existing bedroom block comprising new passenger lift & lift enclosure; extension of retaining wall to rear of bedroom block to provide vehicular access to rear of building; connections to existing foul & storm sewers and to existing waste treatment plant on west side of site
Permission sought for the erection of a new enclosed terrace in the northern hotel carpark. Retention Permission also sought for the construction of an enclosed terrace and the erection of a garden bar structure and associated site works. **Significant further information received on 8.11.22 includes retention of the construction of an enclosed terrace and the erection of a garden bar structures and associated site works**
Permission for development that will consist of the construction of a two storey dwelling house, waste water treatment system, to use existing brother's dwelling entrance to public road and all necessary site works, on an infill site.
Permission for the change of house type for a dwelling house previously granted permission under ref. no. 20653, to use existing brother's dwelling entrance to the public road and all associated site works on an infill site
Permission to construct a 2 storey dwelling house, waste water treatment system, to use existing agricultural entrance via brothers dwelling entrance to public road and all necessary site works on an infill site
Retention Permission and Permission for development consisting of permission for alterations to existing entrance, for retention of existing double sided fuel pump, retention and replacement of existing temporary single sided fuel pump and retention of part retail use within office.
The brief summarizes the pattern across all 112 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2360422The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief