Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
32% of nearby decided applications were refused. The site check found 301 decisions within 5 km, 1 exact-site or onsite candidate record, and 13 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
13 structured nearby appeal records.
13 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For the development consisting of the provision of 2 No. new single pole structures and refurbishment and upgrading works [including (where necessary) replacement of existing poles along the existing overhead electricity line, minor ground works e.g. replacement or installation of stays, and maintenance or improvement works]; and all associated ancillary works including the provision of temporary accessways. Replacement poles will be constructed at, or immediately adjacent to, the existing structures that they will replace. Replacement poles and the new poles will have a maximum height of 12m above ground; and be similar in appearance to existing poles. Planning permission is sought for a 10 year period. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application
Chun; 1. Ionad Cothabhála & Deasú Bád le spás do Oifigí agus áit Stórála chomh maith le h-Oibreacha Coimhdeach eile, 2. Céibh nua agus Ardaitheoir Soghluaiste Bád, 3. Spás Stórála Bád & Carr Chlós ar an suíomh, 4. Ionad cóireála séarachais a thógáil. Tá Ráiteas Tionchair Natura a chur isteach ag an tÚdaras Pleanála leis an t-iarratas. Spás urláir comhlán na n-oibreacha beartaithe: 1268 sqm
For the a new small craft harbour, reclamation of foreshore and dredging of a new small craft harbour basin at Rossaveel Fishery Harbour Centre, Rossaveel, Co. Galway.
Chun Teach nua cónaithe a thógáil chomh maith le Garáiste nua agus Córás searachais. Gross floor space of proposed works: 218.00 sqm(H), 67.20 sqm(G)
For refurbishment of existing slipway to improve low tide access. Raising and widening of slipway deck and the addition of a berthing face. Extension of existing rubble mound breakwater and re-grading of rock revetment to provide further protection of the small draft Harbour.
Chun ath-úsáid a dhéanamh ar charr chlós a bhí ceadaithe faoi pl ref 041483 agus chun oibreacha eile coimhdeach a dhéanamh ar an suíomh. Spás urláir comhlán na n-oibreacha beartaithe: 10sqm
The brief summarizes the pattern across all 301 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2360504The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief