Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 254 decisions within 5 km, 3 exact-site or onsite candidate records, and 13 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
13 structured nearby appeal records.
13 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Dwelling house, proprietary effluent treatment system, domestic shed and all ancillary siteworks and services
CONSTRUCT A DWELLING HOUSE, PETU, DOMESTIC SHED WITH ALL ASSOCIATED ANCILLARY SITE WORKS
KNOCKING DOWN AND REBUILDING A GARAGE
THE RETENTION OF AN EXTENSION TO EXISTING HOUSE, DOMESTIC GARAGE AND SHED AND VEHICULAR AND SERVICE ENTRANCES, TOGETHER WITH ANCILLARY SITE WORKS
THE DEVELOPMENT WILL CONSIST OF THE RE-CONTOURING OF AGRICULTURAL LAND USING IMPORTED BYPRODUCT SOIL AND STONES WITHIN AN AREA OF 5.061 HECTARES FOR THE CONSEQUENTIAL BENEFIT TO AGRICULTURE. PERMISSION IS ALSO SOUGHT FOR THE MODIFICATION OF THE EXISTING AGRICULTURAL SITE ACCESS, AND ALL ASSOCIATED SITE INFRASTRUCTURE REQUIRED FOR THE DEVELOPMENT, INCLUDING ERECTION OF SILT FENCES AT ALL WATERCOURSES. A 10 YEAR PLANNING PERMISSION IS REQUESTED DURING WHICH PERIOD APPROXIMATELY 165,000 TONNES OF BYPRODUCT SOIL AND STONES WILL BE IMPORTED FOR THE PURPOSES OF LAND RECLAMATION. THE PLANNING APPLICATION IS ACCOMPANIED BY A NATURA IMPACT STATEMENT.
RETAIN EXISTING DWELLING HOUSE, P79/428 REFERS
The brief summarizes the pattern across all 254 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 23640The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief