Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 300 decisions within 5 km, 1 exact-site or onsite candidate record, and 5 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
5 structured nearby appeal records.
5 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Extend and renovate existing dwelling house including an upgrade and relocation of septic tank/proprietary effluent treatment system together with all ancillary site works and services
CONSTRUCT A DWELLING HOUSE, GARAGE AND SEPTIC TANK/FOUL EFFLUENT TREATMENT SYSTEM ALL AS PER DRAWING DOCUMENTATION SUBMITTED TOGETHER WITH ALL ANCILLARY SITE WORKS AND SERVICES
PROPOSED DWELLING HOUSE, DETACHED GARAGE AND EFFLUENT TREATMENT SYSTEM, TOGETHER WITH ALL ANCILLARY SITE WORKS AND SERVICES
CONSTRUCT A SILAGE SLAB AND A 3 BAY SLATTED SHED WITH UNDERGROUND SLURRY STORAGE TANK ALONG WITH ALL ASSOCIATED SITE WORKS
Upgrades to the existing Claremorris Wastewater Treatment Plant comprising: Installation of a new inlet works including an inlet flume, duty/assist screens, bypass screen and a grit removal infrastructure; Installation of a new selector tank; Upgrades to the existing aeration system; Installation of a new final settlement tank; Upgrades to the existing RAS/WAS pumping station; Installation of a new picket fence thickener; Installation of a new sludge dewatering unit within the control building; Installation of a new final effluent pumping station; Upgrades to the existing outfall pipeline; New surface water outfall and petrol interceptor; Ancillary mechanical and electrical upgrades; and Associated ancillary site works
CONSTRUCTION OF A DWELLING HOUSE WITH DETACHED GARAGE AND PROVISION OF PACKAGED WASTEWATER TREATMENT SYSTEM, POLISHING FILTER AND ALL ANCILLARY SITE WORKS
The brief summarizes the pattern across all 300 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 23675The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief