Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 22 decisions within 5 km, 1 exact-site or onsite candidate record, and 1 structured appeal.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1 structured nearby appeal record.
1 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To construct a general purpose agricultural shed together with all associated site works. Gross floor space of proposed works: 186.2 sqm
To construct a General Purpose Shed. Gross floor space of proposed works: 91.5sqm
For the erection of 6 no. wind turbines with an overall ground to blade tip height of 185m with a rotor diameter of 162m and a hub height of 104m. The development will also consist of the construction of crane hardstand areas and turbine foundations, improvement of existing site entrance with access onto the N59, construction of one no. temporary construction compound with associated temporary site offices, parking areas and security fencing, installation of 1 no. permanent meteorological mast of 104m overall height, construction of new internal site access tracks and upgrade of existing site track, to include all associated drainage including new clear span bridge crossing of the Owenwee River, development of a site drainage network, construction of one no. permanent 38kV substation, all associated underground electrical and communications cabling connecting the wind turbines to the wind farm substation and biodiversity enhancement measures and peat storage and restoration areas.Gross floor space of proposed works 93.48sqm
Of a temporary Meteorological Mast and associated site works that will operate for a further two years. The meteorological mast will retain its finished height not exceeding 80m above existing ground level consisting of a lattice tubular frame, guy wires and ancillary equipment.
To construct a dwellinghouse, sewage treatment system & garage, together with all associated site works
Of changes made to dwellinghouse since the grant of previous planning permission (pl. ref. 96/2486). Gross floor space of work to be retained: 291 sqm
The brief summarizes the pattern across all 22 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 24311The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief