Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
21% of nearby decided applications were refused. The site check found 473 decisions within 5 km, 1 exact-site or onsite candidate record, and 23 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
23 structured nearby appeal records.
23 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For the development of a solar panel array consisting of up to c.94kWp (c.414m2) of solar panels fixed to metal frames and anchored to the ground, cable ducts and all associated works, as revised by Significant Further Information consisting of a Flood Risk Assessment and an Appropriate Assessment with Natura Impact Statement
(a) Retention of existing mobile home onsite for a period not exceeding 3 years to provide a temporary place of residence while the existing dwelling house onsite is being renovated; (b) Retention of existing front entrance wall to include pillars, wing walls and gates. All development as described to be retained above is located
For new commercial vehicle testing centre with associated signage, new site boundary wall, new entrance, and all associated site works. Revised by Significant Further Information which consists of: The proposal includes additional change of use of existing buildings to (1) workshop ancillary to test center (2) cafe and (3) 3 no. shop units
Construction of a mixed development consisting of: (1) The Hulk (Charter School) and adjacent buildings. Renovations and extension to The Hulk (RPS No: B21-29 / NIAH Ref: 11816103) and adjacent buildings (RPS No: B26-03 / NIAH Ref: 11816104) protected structures comprise of: (a) Craft retail / café space on ground floor, kitchen and toilet facilities to ground floor; (b) Craft exhibition space, community meeting room, office and toilet facilities on first floor; (c) Historic exhibition space, offices and classroom on second floor; (d) Glazed connecting corridor from the Hulk to proposed three storey vertical circulation extension; (e) Renovations of two adjacent dwellings (Block A and Block B) of the Hulk into craft studio spaces; (f) Refurbishment of two existing out buildings along southwest side of walled linen field quadrangle into storage space and associated facilities for proposed allotment area and proposed public market; (g) Required car parking and associated landscaping. (2) Crèche. The construction of a two storey crèche and all associated facilities including car parking, set down area, play area and associated landscaping. (3) 99 No. unit residential development. The construction of residential development comprising of two and three storey 2, 3 and 4 bedroom dwellings consisting of semi-detached, terraced and detached dwellings. This development consists of 11 No. two bed dwellings, 69 No. three bed dwellings and 19 No. four bed dwellings and all associated site works including proposed entrance, proposed landscaping and proposed surface and foul water sewer connections transversing a Special Area of Conservation (SAC) to the north east of site. (4) Removal of a section of existing boundary wall to Portlaoise Road and re-construction of new stone wall set back approximately 4.5m from its original location. (5) A Natura Impact Statement (NIS) will be submitted to the planning authority as part of this planning application
2 no. detached two storey houses (House Type A), 1 no. detached two storey house with attic conversion (House Type B), each house with individual secondary effluent treatment system, recessed entrance and all associated site works. Revised by Significant Further Information which consists of amendment of red line boundary on lands owned by the Applicant to allow for greater secondary effluent percolation area separation distances
(a) 12 no. new two storey type terrace dwelling houses, (b) 2 no. new two storey type semi detached dwelling houses, (c) 1 no. new two storey type detached dwelling house, (d) new car parking (e) shared use existing vehicular entrance (f) new landscaping (g) Pump station / rising main and all associated site development works
The brief summarizes the pattern across all 473 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 24357The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief