Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 2,343 decisions within 5 km, 3 exact-site or onsite candidate records, and 201 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
201 structured nearby appeal records.
201 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Existing independent living unit and Planning Permission for minor alterations to the unit
The construction of a residential development of 46 No. apartments consisting of the following: 1 No. four store apartment block consisting of 23 No. 1-bed apartments, 14 No. 2-bed apartments and a community room. 1 No. three storey apartment block consisting of 9 No. 2-bed apartments. Permission is also sought for the construction of an ESB sub-station, switch room, bin store, bicycle store, landscaped bio-diversity park, external water tank & heat pump units, surface water attenuation swale, connections to existing drainage & water supply network along with all associated site works. A Natura Impact Statement(NIS) accompanies this application
The construction of a new draft lobby at the rear north elevation and the insertion of new windows to the north and west elevations and all associated site works
A temporary period of up to 5 years for the development of 3no. hydrokinetic turbines, associated anchors and marker buoys upstream of Thomond Weir in the River Shannon, a junction box and cable carrying metal conduit along a section of Thomond Weir, connection of the cable to the ESB building on Brown's Quay, placement of power conditioning and power storage unit within the building and the placement of a portacabin in the grounds of the ESB building at Brown's Quay, Limerick City. The project will be for 24 months. A Foreshore Licence Application has been submitted for this development. An Environmental Impact Screening Report, an Ecological Impact Assessment Report and a Natura Impact Statement accompanies this application
Change of use of commercial unit to showroom and office and permission for demolition of existing office and construct a ground and first floor extension to existing commercial unit including a first floor extension area over existing footprint of existing commercial unit. Retention permission for storage shed building and boundary walls and associated site works
Extension to rear of house
The brief summarizes the pattern across all 2,343 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 24447The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief