Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 178 decisions within 5 km, 3 exact-site or onsite candidate records, and 100 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched1 of 2 layers are loaded for Wicklow County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matched2 current citations from the Wicklow County Council development plan, each with section, page and source URL.
2 matched3 of 4 layers are loaded for Wicklow County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
100 structured nearby appeal records.
100 matchedCitations are current-dated and carry policy name, section, page and source URL from the Wicklow County Council development plan.
2 matchedOpen preview
Open preview
Subdivision of existing dwelling into 2no. dwelling units. Permission is sought to erect extensions and make alterations to both units and all associated site and ancillary works to include deconstruction of storage shed
The installation of a new 18.1 metres telecommunication support structure carrying antennas, a dish, associated equipment, ground-based equipment cabinets, fencing and all associated site development works for high speed wireless data and broadband services
Erect scaffolding in front of the residential dwellings of number 8, 9 & 10 Main Street, Carnew with the view to replace the existing plaster on the exterior walls with new plaster (material to be used - sand, cement)
Erect extensions to the rear of our dwelling at ground floor and first floor level and all associated site and ancillary works (Protected Structure Ref 47-06)
Demolish an existing two storey residential property and ancillary structures and to construct a three storey building consisting of the following; a two-bedroom apartment to the ground floor; a three-bedroom two storey duplex apartment to the first and second floor; connection to existing public services; site works boundary treatments and hard landscaping; ancillary works
Roof-mounted Photovoltaic Solar Panels with a maximum square meterage of 500 m2 distributed over 1,260 m2 of two separate low-pitched roof sections adjacent to each other on the existing main factory building complete with associated ancillary works
The brief summarizes the pattern across all 178 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 24495The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief