Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 59 decisions within 5 km, 2 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched1 of 2 layers are loaded for Mayo County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedOne current citation from the Mayo County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Mayo County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Citations are current-dated and carry policy name, section, page and source URL from the Mayo County Council development plan.
1 matchedOpen preview
Open preview
Construct a private dwelling house, domestic garage, a proprietary effluent treatment system and ancillary site development works
Construction of Dwelling House with Effluent Treatment System & associated site works.
RETAIN MINOR INTERNAL ALTERATIONS TO EXISTING PUB AND CONVERSION OF ATTIC SPACE FOR FIRST FLOOR APARTMENT, MINOR ELEVATIONAL ALTERATIONS AND REVISED SITE BOUNDARIES TOGETHER WITH ALL ANCILLARY SITE WORKS
Construction of a new single storey dwelling house, a detached domestic garage, new package wastewater treatment system and percolation area, together with all ancillary site services
Planning Permission for Development consisting of construction of a manure pit, dual purpose storage/loose shed with an effluent tank & slatted sheep shed with an underground slurry storage tank along with all associated site works. Proposed dual purpose storage/loose shed will have a roof height 6.310m, & proposed slatted sheep shed will have a roof height of 7.605m. All structures are to be built in an existing farmyard.
CONSTRUCT DWELLING HOUSE, WASTEWATER TREATMENT UNIT AND PERCOLATION AREA
The brief summarizes the pattern across all 59 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 24544The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief