Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 717 decisions within 5 km, 2 exact-site or onsite candidate records, and 50 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
50 structured nearby appeal records.
50 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construct an electrical transmission support long duration battery array. The array will consist of 52 number battery storage containers each holding battery storage units of up to 4.5MW for a maximum total of 234MQ together with associated site services
The Development will consist of Permission to construct a 2-storey dwelling with single storey rear return, detached garage, WWTP and percolation area, construction of a new access to an existing laneway and all associated site works.
Demolish an existing entrance porch and to construct a new entrance porch
TEMPORARY PERMISSION FOR DEVELOPMENT FOR THE PARTIAL CHANGE OF USE OF EXISTING SITE FROM RETAIL WAREHOUSING TO MOTOR SALES USE, INCLUDING THE PARKING OF MOTOR VEHICLES FOR PURPOSE OF DISPLAY AND SALE, ERECTION OF A TEMPORARY ACCOMMODATION BUILDING, ASSOCIATED SIGNAGE AND ALL ANCILLARY AND ASSOCIATED DEVELOPMENT WORKS
Change the use of the existing 2-storey retail warehouse use to 2-storey gymnasium use, including removal of interior partitions, providing additional sanitary accommodation and connecting into existing services.
REVISE PREVIOUS PLANNING PERMISSION P20/858, THE REVISED DESIGN INCLUDES AMALGAMATING THE PREVIOUSLY PROPOSED 4 NO. WAREHOUSE/COMMERCIAL UNITS INTO 1 NO. UNIT COMPRISING OF AN ADDITIONAL 1180M2 OF FLOOR AREA, ANCILLARY OFFICE SPACES, LOADING BAYS, CAR PARKING, ACCESS ROADWAY, PUBLIC FOOTPATHS LANDSCAPING AND CONNECTION TO PUBLIC SERVICES INCLUDING ALL ANCILLARY SITE WORKS
The brief summarizes the pattern across all 717 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 24546The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief