Applications tied to the site
Partial coverage6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
13% of nearby decided applications were refused. The site check found 560 decisions within 5 km, 6 exact-site or onsite candidate records, and 50 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
50 structured nearby appeal records.
50 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Installation of 109.08 KW (512.9M2) of ground mounted Solar PV Array and associated site works and services. Included in this application is a Landscape visual impact assessment (LVIA),an appropriate assessment screening (AA), a site specific flood risk assessment, and a glint & glare assessment
Demolition of existing disused industrial buildings including gas bottle filling plant, warehouse, administration offices, site office, security office and store of total floor area 2035 sqm.
Modifications to the previously approved planning permission reference 19/368 comprising: • Relocation of the previously approved external plant room to a new position adjacent to the southwestern site boundary. • Provision of a 42sq.m steel storage and maintenance shed. • Reconfiguration of the site plan including access roads and ramps within the site, updated landscaping proposals, hard and soft landscaping; and all associated ancillary site works. • Reduction of the overall car parking numbers from 90 no. to 80 no. (including 5 no. accessible spaces). • Reduction in the overall building height by 600mm. • Minor design changes to the elevations generally including the western stair core, ground floor store area, former external plant area, former balcony at second floor. • Enclosure of the 36sq.m former balcony space at level 2 to form an internal meeting room / office space, with an openable glazed screen and handrail. All on a c.0.88ha. site
Landmark 3 no storey commercial office building with a total gross floor area of c 2519 sqm including all associated plant, a new main entrance onto Mill Road along the northern boundary, a new service entrance onto Mill Road along the eastern boundary, an internal road network to serve an associated apron car parking area comprised of 90 no car parking spaces (*including 5 no accessible spaces), 20 no bicycle parking spaces, a temporary on site wastewater treatment plant, lighting, hard and soft landscaping, and all associated ancillary site works all on a 0.88 ha site. A Natura Impact Statement accompanies the application
Entrance onto North Quay / Marina Road to the rear of their existing premises and all associated site works
Demolition of the existing three storey detached office building (646 sqm) and single storey outbuilding (30 sqm); and the construction of a new five storey apartment block (3,196 sqm GFA) comprising of 34 No. apartments (14 No. one-bed apartments and 20 No. two-bed apartments, all with balconies on the southwest façade) The development will also consist of: ESB substation and switchroom; waste storage areas; plant; bicycle parking; 34 No. car parking spaces; SUDs (including green roof); associated hard and soft landscaping; the creation of 2 No. new entry/egress points off North Quay; all other associated site excavation, infrastructural and site development works above and below ground including changes in level, boundary treatments, and associated site servicing (foul and surface water drainage and water supply)
The brief summarizes the pattern across all 560 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2460697The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief