Free preview / €29 incl. VAT site brief

Site planning risk brief

Fix the brief to an Eircode, a dropped pin or a drawn site boundary. PlanIntel then checks the planning register, available spatial layers, appeals and current indexed policy evidence.
See sample PDF

Define the land to check

Townlands of Halverstown , Jigginstown and Newhall , NaasOpens secure checkout for the €29 incl. VAT site risk brief. Promotion codes can be entered at checkout.
€29 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelSite risk brief preview

Site planning risk brief

Townlands of Halverstown , Jigginstown and Newhall , Naas

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

12% of nearby decided applications were refused. The site check found 1,329 decisions within 5 km, 2 exact-site or onsite candidate records, and 115 structured appeals.

Matched source
2460787
Project type
One-off house
Coverage
5 km radius

What this site brief can substantiate today

Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.

Applications tied to the site

Partial coverage

2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.

2 matched

Zoning and settlement

Not yet covered

Current indexed zoning and settlement layers are intersected with the selected site where coverage exists.

Rural-housing policy

Not yet covered

Current section-and-page citations have not yet been loaded for this authority.

Flood, heritage, ecology and archaeology

Not yet covered

Each layer reports its own coverage; missing coverage never appears as a clean result.

Access, road and wastewater prompts

Partial coverage

0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.

Structured appeal history

Confirmed coverage

115 structured nearby appeal records.

115 matched

Current policy citations

Not yet covered

Historic extracted references are not presented as current policy; verified citations are still being loaded.

1,329Nearby applications
2Site-linked candidates
12%Nearby refused
115Structured appeals

Top refusal reasons nearby

No reasons on record yet

More refusal reasons are being processed from public planning records.

Nearest planning decisions

2460787

For a Data Centre and will comprise of: The demolition of 3 no. dwelling houses, associated garages and farm outbuildings / agricultural buildings (total floor area 1,591m2); The construction of 6 no. two storey data centre buildings, each with loading bays, external plant area including electrical and mechanical plant rooms, fuel compound, sprinkler tanks and associated ancillary development; Data centre building Nos. 1, 2, 3, 4 and 6 will consist of: a data hall (24,756m2, overall height 19m), an administration block (2,505m2 overall height 15m) and include an external screened plant area of 18m in height and 6,164m2; Gas turbines, gas engine and battery energy storage systems will be provided within each plant area; Data centre building No. 5 will consist of: a data hall (24,756m2, overall height 19m), an administration block (2,505m2 overall height 15m) and include an external screened plant area of 18m in height and 6,375m2 in area and includes infrastructure for district heating; Gas turbines, gas engine and battery energy storage systems will be provided within the plant area; Adjacent to each data centre building will be a screened sprinkler tank compound (408m2 to 528 m2 in area) comprising of 3 no. above ground sprinkler pump containers, (1 no. 240m3 and 2 no. 268.8m3 containers) and a screened fuel compound (331m2 in area) comprising 1 no. 38m3 fuel pump container and 6 no. 64m3 tanks; and Solar panels with a total area of 3,600m2 will be provided on the roof of each data centre building and rainwater harvesting is included in the development. The proposed development of the Data Centre also comprises: A screened Gas Networks Ireland (GNI) compound (61m2 in area) with 1 no. kiosk (3m in height and 19.5m2 in area) with a biomethane gas injection point; A screened above Ground Installation (AGI) compound (1,753m2 in area) with 4 no. kiosks each of 3m in height and 51.5 m2 in area; A district heating building (5m in height and 341m2 in area) district heating plant and in ground piping for district heating system; Security hub building (4.1m in height and 42m2 in area) at main entrance to the proposed development; A single storey admin workshop/office (504m2 in area) and water treatment plant (315m2 in area) building (4.8m in height) and associated hydrant pump room (5m in height and 80m2 in area) and 2 no. hydrant pump room storage tanks (5m in height and c.251m3 in area); A new access/egress from the R409 and a new emergency access/egress from th

Granted0.0 km20 August 2025
18624

The construction of 266sqm extension, with a ground floor of 206sqm and a mezzanine of 60sqm, connection to existing services and all associated site works to the side of our existing industrial unit at M7 Business Park. The structure will be constructed in a three bay portal framed, metal cladding to match the existing unit

Granted0.4 km18 July 2018
21596

An existing 25 metre high telecommunications support structure together with associated ground equipment cabinets within a fenced compound

Granted0.4 km23 June 2021
19738

Erection of a 3m high fence around perimeter of the site, 2 no. vehicular entrance gates and 1 no. pedestrian entrance, along with all associated site works. Note. A concurrent application is being sought for a regional depot on the site to be contained by the new fencing and gates

Granted0.4 km12 March 2020
19739

A regional depot building (2,057 sqm gfa). This building will contain a 4-bay machine repair area with three-storey machine parts storage (max. c. 16m high), along with two-storey administration area. It is also proposed to provide an ancillary building (c. 10.79m high) containing storage and internal wash bay (302 sqm gfa); a permanent tower crane (c. 14m high), external wash bay; underground storage tanks; car parking; cycle parking; landscaping; 2 No. free-standing signs and all associated site works. Note: a concurrent application is being sought for perimeter fence around the site, 2 No. vehicular entrance gates and 1 No. pedestrian entrance,

Granted0.4 km12 March 2020
211426

For the construction of a 2.4m high paladin fence on the south west & north west boundary of the site & all ancillary site works

Granted0.4 km26 November 2021

The brief summarizes the pattern across all 1,329 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.

The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.

Exact site history and boundary checks

Site brief

Policy and mapped constraints

Site brief

Appeals and comparable decisions

Site brief

Deterministic risk prompts

Site brief
Ready to get the site risk brief?€29 incl. VAT once-off PDF, no account required