Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
4% of nearby decided applications were refused. The site check found 393 decisions within 5 km, 3 exact-site or onsite candidate records, and 29 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched1 of 2 layers are loaded for Tipperary County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Tipperary County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Tipperary County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
29 structured nearby appeal records.
29 matchedNo current-dated citation is loaded for Tipperary County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
A) the location of the dwelling house and detached garage as constructed on site instead of the location granted under P3/7369, b) the vehicular stone entrance and road side stone boundary wall, c) the chimney to the rear of the kitchen, d) the enclosing open porch with Upvc to form enclosed entrance porch, e) the lean to glazed unit at the rear back door, f) the forming bedroom/study with velux roof light to attic roof space on the first floor, g) internal changes to ground floor layout plan, h) replacement of external original teak windows/doors with Upvc windows/doors
The construction of an extension to the side of the existing dwelling house and for the upgrade of the existing effluent treatment system with all other associated site works
A new slatted shed, with underground slatted tank, feed passage and concrete apron and all associated works
(a) a new farmyard entrance in place of existing roadside entrance, (b) construction of an agricultural building to include milking parlour, dairy, ancillary rooms, waiting yard, underground slatted soiled water storage tank and livestock handling and drafting facilities and installation of solar panels on roof, (c) erection of a meal bin and water storage tank and all associated siteworks
To construct a new relocated entrance and stone wall, replacing existing entrance and hedging, to the front of our existing dwelling
The construction of a dwelling house, storage shed, entrance, driveway, treatment system and all associated site development works
The brief summarizes the pattern across all 393 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2487The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief