Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
2% of nearby decided applications were refused. The site check found 189 decisions within 5 km, 1 exact-site or onsite candidate record, and 6 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
6 structured nearby appeal records.
6 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The construction of an underground slatted effluent tank and to carry out all associated site works
Single storey extensions to dwelling house, domestic garage and all associated site works
The demolition of a 43sqm single storey extension to rear, construction of a new 66sqm single storey extension to rear and associated alterations to existing single storey dwelling, change of use of 40sqm agricultural shed to home office and domestic store room, new treatment system and percolation area and all associated site works
The erection of a 36 metre high multi-user lattice telecommunications structure, carrying antenna and dishes enclosed within a 2.4 metre high palisade fence compound with associated ground equipment cabinets, creation of new entrance access track and site works
New two storey dwelling, garage, septic tank with effluent treatment system, site entrance and associated site works
The construction of a new 6 span A-roofed slatted shed complete with underground effluent tank and all associated site works
The brief summarizes the pattern across all 189 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 25198The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief