Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 192 decisions within 5 km, 1 exact-site or onsite candidate record, and 7 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
7 structured nearby appeal records.
7 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construct machinery shed together with associated site services
Permission to retain existing domestic storage shed, permission to construct machinery shed/boat repair and storage shed together with associated site services
Construction of a new dwelling house, detached garage, wastewater treatment system, and all associated site works and landscaping.
CONSTRUCT DWELLING HOUSE WITH DOMESTIC GARAGE WITH CONNECTION TO EFFLUENT TREATMENT SYSTEM AND PERCOLATION AREA TOGETHER WITH ASSOCIATED SITE SERVICES
1. COMPLETION OF RENOVATION WORKS, 2. CONSTRUCTION OF NEW EXTENSION, 3. ALTERATIONS TO EXISTING OUT BUILDINGS, 4. CONSTRUCTION OF NEW PROPRIETARY TREATMENT SYSTEM TO REPLACE EXISTING SEPTIC TANK, TOGETHER WITH ALL ANCILLARY SITE SERVICES ON LANDS P07/2617 REFERS
Alterations to previous grant of permission reference P20/897. The development will consist of works to the existing cottage/dwelling house, namely the completion of renovation works, construction of new extension, construction of new proprietary effluent treatment system to replace the existing septic tank, construction of a domestic garage, together with all ancillary site works
The brief summarizes the pattern across all 192 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 25447The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief