Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 148 decisions within 5 km, 1 exact-site or onsite candidate record, and 3 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
3 structured nearby appeal records.
3 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Retention permission for an existing dwelling house as constructed, along with planning permission for alterations and extension to same, new septic tank treatment system along with all ancillary site works
Changes to existing dwelling house as constructed, previous planning permission ref. no. P00/315, and planning permission for the upgrading of existing septic tank system to tertiary treatment system along with all ancillary site works
Refurbish an existing derelict dwelling house including removal of 2 chimneys and construct a 67 sq.m extension to the rear (south) of the dwelling along with installation of a new effluent treatment system with soil percolation area and associated site works.
Permission to demolish existing dwelling house, removal of mobile home and for the construction of a new dwelling house, septic tank, percolation area, domestic detached garage, connection to existing services and all associated ancillary site works
DEMOLITION OF EXISTING OUTBUILDINGS, PARTIAL DEMOLITION AND REFURBISHMENT OF EXISTING DWELLING AND CONSTRUCTION OF NEW 214M2 TWO STOREY EXTENSION INCLUDING SEPTIC TANK AND PERCOLATION AREA WITH ASSOCIATED SITE WORKS AS REQUIRED
CONSTRUCT A 4 BAY ENCLOSED SINGLE SLATTED SHED AND TANK AND ASSOCIATED WORKS.
The brief summarizes the pattern across all 148 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 25518The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief