Free preview / €29 incl. VAT site brief

Site planning risk brief

Fix the brief to an Eircode, a dropped pin or a drawn site boundary. PlanIntel then checks the planning register, available spatial layers, appeals and current indexed policy evidence.
See sample PDF

Define the land to check

Aonad 1 Estát Tionsclaíochta Béal an Mhuirthead , Bóthar Bhéal an Átha , Béal an MhuirtheadOpens secure checkout for the €29 incl. VAT site risk brief. Promotion codes can be entered at checkout.
€29 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelSite risk brief preview

Site planning risk brief

Aonad 1 Estát Tionsclaíochta Béal an Mhuirthead , Bóthar Bhéal an Átha , Béal an Mhuirthead

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

8% of nearby decided applications were refused. The site check found 211 decisions within 5 km, 5 exact-site or onsite candidate records, and 7 structured appeals.

Matched source
2560827
Project type
One-off house
Coverage
5 km radius

What this site brief can substantiate today

Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.

Applications tied to the site

Partial coverage

5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.

5 matched

Zoning and settlement

Not yet covered

Current indexed zoning and settlement layers are intersected with the selected site where coverage exists.

Rural-housing policy

Not yet covered

Current section-and-page citations have not yet been loaded for this authority.

Flood, heritage, ecology and archaeology

Not yet covered

Each layer reports its own coverage; missing coverage never appears as a clean result.

Access, road and wastewater prompts

Partial coverage

0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.

Structured appeal history

Confirmed coverage

7 structured nearby appeal records.

7 matched

Current policy citations

Not yet covered

Historic extracted references are not presented as current policy; verified citations are still being loaded.

211Nearby applications
5Site-linked candidates
8%Nearby refused
7Structured appeals

Top refusal reasons nearby

No reasons on record yet

More refusal reasons are being processed from public planning records.

Nearest planning decisions

2560827

Athruithe ar Thagairt Pleanála 23/502 a dhéanamh, le mhéadú ar airde chuid den fhoirgneamh chun freastal mar stiúideo teilifíse, fuinneoga nua, doirse nua, agus doras rollaí nua, chomh maith le hathruithe suímh gaolmhara san áireamh

Granted0.0 km30 March 2026
23502

Ta iarratas ar chead pleanala a lorg d'athru usaide de 398m2 o thionsclaioch eadrom go husaid oifige agus d'athruite ar na hingearchlonna, ar a n-airitear fuinneoga nua, doirse nua, doras rollala nua agus athru ar an uchtbhalla ar an bpiosa aon-stoir den fhoirgneamh, chomh maith le hathruithe suimh gaolmhara. Ta iarratas ar chead coinneala a lorg do dha dhoras gloine ar an aghaidhchlo

Granted0.0 km27 October 2023
2560327

An fhoirgneamh tráchtála atá ann cheana féin a choinneáil mar a tógadh é, lena n-áirítear na hoibreacha suímh gaolmhara ar fad agus gach nasc le seirbhísí.

Granted0.1 km17 July 2025
19210

RETAIN 27.9 SQM AND 25.5 SQM REAR AND SIDE EXTENSIONS AS CONSTRUCTED. PERMISSION FOR CONSTRUCTION OF NEW GABLE END WINDOW AND REMOVAL OF STONE CLADDING TO FRONT ELEVATION

Granted0.1 km14 May 2019
19491

RENOVATE AND ALTER EXISTING HOUSE, CONSISTING OF RE-DEVELOPMENT OF EXISTING KITCHEN WING AND CONSTRUCTION THEREOVER OF 2 NO. BEDROOMS, ALTER AND AMEND EXISTING ELEVATIONS, UPGRADE/MODIFY EXISTING ENTRANCE TO THE PUBLIC ROAD, INSTALL A WIND TURBINE WITH A MAST HEIGHT OF NO GREATER THAN 10M AND ROTOR DIAMETER NOT EXCEEDING 6M AND CARRY OUT ALL REQUIRED ANCILLARY WORKS ON SITE

Granted0.1 km07 November 2019
2560571

Construction of a warehouse and connecting canopy to the existing factory building and all ancillary works

Granted0.1 km13 October 2025

The brief summarizes the pattern across all 211 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.

The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.

Exact site history and boundary checks

Site brief

Policy and mapped constraints

Site brief

Appeals and comparable decisions

Site brief

Deterministic risk prompts

Site brief
Ready to get the site risk brief?€29 incl. VAT once-off PDF, no account required