Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
13% of nearby decided applications were refused. The site check found 1,421 decisions within 5 km, 3 exact-site or onsite candidate records, and 92 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
92 structured nearby appeal records.
92 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For the erection of a new totem sign (Ford Transit Centre) and all associated site work
2 No. two-storey extensions linked to existing motor dealership, comprising car display areas, workshops, parts stores, staff offices and WC's, 2 Nos. external totem signs, relocated attenuation area and revised onsite car parking layout. Access to proposed development via existing road entrance
The utilisation of the existing services access/entrance onto Cork Road as a permanent secondary vehicular access/entrance to Waterford Retail Park. Planning permission is also being sought for development which will consist of junction upgrade works, new pedestrian crossing and right turn lane, and all associated site works necessary to facilitate the development.
To replace existing forecourt sign with new sign in new location. Fit new signage to side elevation and replace existing columns to front and side with new slimmer columns
Change of use of light industrial use to service based industrial use. The facility will provide for training and recruitment services to the construction, technology and security industries and associated administration, human resources and data processing (in accordance with SI 81/2010), storage and ancillary works
Proposed new two storey car sales showroom building with three bay garage, floor area = 559.61 m2, four bay workshop building, floor area =256.60 m2, two no. totem signs, external vehicle display areas, alterations to boundary fencing, new vehicular entrance, connection to services and all associated site works
The brief summarizes the pattern across all 1,421 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2560842The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief