Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
4% of nearby decided applications were refused. The site check found 164 decisions within 5 km, 1 exact-site or onsite candidate record, and 2 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Mayo County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedOne current citation from the Mayo County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Mayo County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2 structured nearby appeal records.
2 matchedCitations are current-dated and carry policy name, section, page and source URL from the Mayo County Council development plan.
1 matchedOpen preview
Open preview
Planning Permission to carry out partial demolition of an existing dwelling and to construct a new extension, along with a proprietary effluent treatment system, domestic garage, and all associated ancillary site development works
The development will consist of the renovation of an existing dwelling and the construction of a single storey extension, along with any associated site development works.
CHANGE OF USE FROM A DWELLING HOUSE TO A PRE-SCHOOL FACILITY AND ALL ANCILLARY SITE WORKS AND SERVICES
Planning permission for the clearance of the existing site including an old stone ruin and then the construction of two three-bedroom two-storey dwelling houses complete with garden sheds, access driveways, connection to public services and including all ancillary site works and services.
CONSTRUCT NEW DWELLING HOUSE, DOMESTIC GARAGE, SEWAGE TREATMENT UNIT AND PERCOLATION SYSTEM, TOGETHER WITH ANCILLARY SITE DEVELOPMENT WORKS.
Permission is sought to make the following changes to houses granted under previous grant of permission P24/60005 1. retain at present stage of construction and complete modifications to the design of houses previously granted permission on sites nos. 1,2.3.6 and 7 10,11,14,15,19,20.21,22,23 and 24 and, 2. Ancillary site works and services;
The brief summarizes the pattern across all 164 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2560909The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief