Applications tied to the site
Partial coverage11 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
11 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 1,310 decisions within 5 km, 11 exact-site or onsite candidate records, and 106 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
11 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
11 matched1 of 2 layers are loaded for Louth County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Louth County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Louth County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
106 structured nearby appeal records.
106 matchedNo current-dated citation is loaded for Louth County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Permission comprises the construction of 4no. new 3-bedroomed semi-detached dwellinghouses, new temporary waste water treatment plant which will be connected to the mains wastewater network and all ancillary and all associated site development works including site clearance works, new vehicular entrances off the Main Street, car parking spaces, hard and soft land scaping and boundary treatment works.
Permission for the construction of 4 no. new 3 bedroomed semi-detached dwelling houses and all ancillary and associated site development works including site clearance works, new vehicular entrances off the Main Street, car parking spaces, hard and soft landscaping and boundary treatment works *Significant Further Information Received on 31/07/2025 - Alterations to front and side site boundaries*
Retention and completion of alterations to a previously granted planning permission, reference number 2360521 (Demolition of an existing garage, alterations and extensions to an existing two storey dwelling, including construction of extensions to the side and rear, elevational changes, revised boundary treatments / vehicular entrance with all site development works.); the alterations to include an additional to the proposed ground floor rear extensions with associated plan/elevations changes and all associated site development works; with full permission for replacement of the existing hedgerow to the south western boundary with a wall/railing and all associated site development works
Permission for demolition of an existing garage, alterations and extensions to an existing two storey dwelling, including construction of extensions to the side and rear, elevational changes, revised boundary treatments/vehicular entrance with all site development works
Permission for the construction of a rendered block wall to replace the timber fence which will be used to house the existing bin bay area and all associated site development works
Extension of Duration: Na hoibreacha ata i gceist san fhorbairt na cur le tosach an ionaid diola ata ann cheana, ardu airde an dion, togail leithreas scoite ar chul an ionaid diola ata ann cheane agus comhartaiocht comthiomsaithe agus oibreacha laithreain uilig a bhaineann leis an forbairt. ***The development will consist of extension to the front of existing building, increase in roof height, construction of detatched toilet block at rear of unit, signage and associated site works.*Significant Further Information was received on 25/11/2013 which provided for interalia, the provision of a storage area at first floor level ancillary to the use of the butchers shop*
The brief summarizes the pattern across all 1,310 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2619The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief