Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
3% of nearby decided applications were refused. The site check found 79 decisions within 5 km, 2 exact-site or onsite candidate records, and 3 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched1 of 2 layers are loaded for Sligo County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Sligo County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Sligo County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
3 structured nearby appeal records.
3 matchedNo current-dated citation is loaded for Sligo County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Construct a new slatted shed and silage base together with all ancillary site works and services.
Development consisting of; (a) demolition of existing derelict dwelling house; (b) construction of a proposed dwelling house, garage septic tank system and percolation area, complete with all associated works
Development consisting of the construction of a dwelling house, garage, proprietary effluent treatment unit and soil polishing filter on site, together with all ancillary site works and services.
(1) a new effluent treatment system and percolation area (2) to retain revised site boundaries (3) to retain existing garage (4) to retain existing domestic shed (5) to retain existing windows in gables of existing house (6) and all associated site works
1. An extension to the rear of an existing cottage. 2. A new front porch. 3. A new sewage treatment plant with raised tricel puraflo modules and a distribution area. 4. Minor alterations to existing cottage. 5. And all ancillary site works at this site
Construction of a new bungalow type dwelling. Construction of a new wastewater treatment plant and percolation area in accordance with EPA Code of Practice. Construction of a new vehicular entrance and access road to serve dwelling. All associated site development works
The brief summarizes the pattern across all 79 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2660175The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief