Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
3% of nearby decided applications were refused. The site check found 103 decisions within 5 km, 1 exact-site or onsite candidate record, and 4 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
4 structured nearby appeal records.
4 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For development at this site. The development will consist of the provision of residential accommodation (8 modular housing units) for the exclusive occupation by workers to Galmoy Mine for the duration of the mine life within a site area of 0.55 ha. The development will also include provision of a wastewater treatment system and associated percolation area, bin storage area, parking, extension of an internal road (c. 165 m) and all associated ancillary works
Temporary retention permission for the continuation of use and change of use of the site, the security building and the ground floor of the administration building from its previous mining use to an administrative and logistics centre, on the site of the former "Galmoy Mines", temporary retention permission is also sought for the use of an external hardstand area for the storage of vehicles, all associated car parking and services of the former "Galmoy Mines"
For development at this site. The development will consist of recommencement of underground mining at the former Galmoy Zinc and Lead Mine, comprising access portal, declines, ventilation shafts and extensions to existing underground workings. It is also proposed to extend the mine into the townsland of Kyle, Co. Laois and a separate application will be lodged seek permission to mine the orebody in Co. Laois. The proposed development will also involve the refurbishment of a number of existing mine related surface structures, dewatering wells, and buildings including the Goul pumphouse, 3 no. workshops, administration building which includes provision for offices, laboratories, storage warehouse areas, toilets and washing facilities, fire and fresh water pumphouse, and associated infrastructure, mine change house, security hut, weighbridge, transformers, sub-stations and switch-rooms, stormwater pond and conditioning pond, rock storage area for the storage of soil, overburden and rock from the mine workings and the ore storage structure (teepee) as part of the ore crushing plant. Permission is also sought for the demolition of the existing plant electrical building in order to provide for the provision of new ore screening and sorting plant and associated stock-piling areas. Permission is also sought for the replacement of the previous water treatment plant with a new water treatment plant to treat mine and site water in a new location within the plant site. The new water treatment plant will also reuse and refurbish the existing backfill thickener tank as part of the revised plant. Permission is also sought for the provision of a mine backfill plant consisting of feed-hoppers, crushing equipment, ball mill, 13.9m high cement silo and mixer. The mine backfill plant is to be located adjacent to the existing ESB sub-station in the North of the existing plant site. The proposed development also includes for the following ancillary elements; structures for fuel and emulsion storage; water and other pipelines, water discharge diffuser, the installation of a new proprietary effluent treatment system to deal with foul water and wheel wash. Permission is also sought for the provision of two new wells and associated ancillary pumping infrastructures for the supply of supplementary water to the Galmoy Rathdowney public water supply (GRPWS). DESCRIPTION NOT COMPLETE
Of planning permission 11/624
To construct an entrance and access road at our lands for forestry use and all associated site works
To renovate and extend dwellinghouse, install septic tank with percolation system, construct garage, relocate vehicular entrance and all associated site works
The brief summarizes the pattern across all 103 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2660278The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief