Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 137 decisions within 5 km, 1 exact-site or onsite candidate record, and 5 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
5 structured nearby appeal records.
5 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construction of a new dwelling house, septic tank and percolation area along with ancillary site works
The development will consist of the (1) demolition of existing dwelling house and shed, (2) construction of a replacement dwelling house with attached independent living unit, (3) upgrading of existing wastewater treatment system with new treatment plant and soil polishing filter, and all associated site works
CONSTRUCT DWELLING HOUSE, WITH PETU AND ALL ASSOCIATED SITE DEVELOPMENT WORKS ON FAMILY LANDS
CONSTRUCT A DWELLING HOUSE, WITH PETU AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
Upgrade of raw water pumps and controls, modification of underground tanks to provide a dedicated raw water tank, installation of equipment to improve process including a new flocculation tank, clarification tank, dissolved air flocculation. UV reactor dedicated chemical delivery area, and associated pumps, piping and valves and accessories. Construction of solids management consisting of tank for settlement and associated pumps and infrastructure. Installation of new concrete slab and installation of new sludge holding tank (45m3), settlement tank, sludge balancing tank, alum tank, DAF and all associated ancillary works and associated engineering works. Works also include the installation of pumps and pipework to the treated water storage tank including a scrubber within the Callow Water Reservoir site
ALTERATIONS AND EXTENSION TO EXISTING DWELLING HOUSE ALONG WITH ALL ANCILLARY SITE WORKS
The brief summarizes the pattern across all 137 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2669The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief