Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 2,684 decisions within 5 km, 1 exact-site or onsite candidate record, and 224 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
224 structured nearby appeal records.
224 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The use of the site for the storage of Titan Storage Containers for self storage uses, modular office (incorporating a toilet and kitchenette), sliding gate, signage and all ancillary site works
Construction of 1.no storage unit and 1 no. maintenance unit, vehicular accesses from an existing access road, parking, bin store, fences, signage, connections to existing services and all ancillary associated site works
The construction of a 24 metre-high free standing communications structure with its associated antennae, communication dishes, ground equipment and all associated site development works. The development will form part of Eircom Ltd existing telecommunications and broadband network
The construction of 3 warehouse blocks with 1 block subdivided into 2 warehouses, 1 block subdivided into 3 warehouses and 1 standalone warehouse, new entrances, blocking up of existing entrance, internal access roadway and car parking, connection to necessary services and all associated site works and; Retention permission for existing as-constructed freestanding scaffolding storage building which is to be relocated within the existing site
The construction of 9 no. dwelling houses, comprising 3 no. pairs of semi-detached 2storey houses (6 units) and 1 terrace of 3 no. 2storey houses (3 units), a new entrance from the public road, connections to the public sewer and all services, together with all associated site development works including internal estate road, car parking, footpaths, and all ancillary works
The change of use from Industrial warehousing to a gymnasium with all associated services, minor elevation changes to the existing building with the inclusion of proposed signage, construction of a new partial mezzanine floor at first floor level to serve as part of the gymnasium along with associated site works
The brief summarizes the pattern across all 2,684 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 211071The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief