Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
27% of nearby decided applications were refused. The site check found 205 decisions within 5 km, 3 exact-site or onsite candidate records, and 3 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
3 structured nearby appeal records.
3 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To renovate existing cottage. Works to consist of new roof 6.1m in height, new extension to rear 21.07 sqm in ground space. Height 5.9m and associated ground works for pumping waste water to existing septic tank system and site drainage to existing drain system. Rooms to include home office, studio space, toilet and kitchenette. Gross floor space of proposed works: 58.28 sqm.
Chun na oibreacha atá deanta ar an suíomh go data a choinneáil chomh maith le athrú atá deantá ar leagan amach ar an suíomh a bhí ceadaithe faoi cead pleanail 19/1832 a choinneáil chomh maith le athrú ar plean an tí a bhí ceadaithe freisin faoi uimhir pleanail 19/1832 a choinneáil. Spás urláir comhlán na n-oibreacha beartaithe: Teach: 176.7 sqm, Garáiste: 54 sqm
Chun teach nua cónaithe dhá stór a thógáil chomh maith garáiste nua agus le córás searachais nua. Spás urláir comhlán na n-oibreacha beartaithe: Teach - 176.7 sqm, Garáiste - 54 sqm. Spás urláir comhlán d'aon scartáil: 42.44 sqm
Chun aonad féin fhreastail a thógail (Granny flat) ar aghaidh an teach cónaithe atá ann cheana féin, tá an t-aonad comhdhéanta de síneadh stór amhain ar airde agus gach seirbhís láithreáin a bhaineann leis chomh maith le uasghradrú ar an Córás searachais atá an cheanna fheín
Le haghaidh suíomh an tí chónaithe atá ann cheana féin mar atá, agus suíomh an chórais cóireála fuíolluisce ar an láthair mar atá tógtha, de réir an Cheada Pleanála Ref. 99/2934; tógáil síneadh nua agus póirse tosaigh; athruithe ar an teach cónaithe atá ann cheana féin lena n-áirítear díon nua chun an t-áiléar a thiontú, fuinneoga dín, dormán cúil; agus na hoibreacha láithreáin ghaolmhara go léir
Chun teach cónaithe. coras séarachais agus gáráiste chomh maith le gach obair láithreáin ag teastáil a thógáil.Spás urláir comhlán no n-oibreacha beartaithe: teach 218 más cuí, garáiste 60 más cuí.
The brief summarizes the pattern across all 205 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 212037The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief