Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
15% of nearby decided applications were refused. The site check found 405 decisions within 5 km, 1 exact-site or onsite candidate record, and 16 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
16 structured nearby appeal records.
16 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For a solar PV Energy Development with a total site area of 206ha, to include solar panels mounted on steel support structures, associated cabling and ducting, 54 No. MV Power Stations, 2 No. Client Substations, 4 No. Temporary Construction Compounds, access tracks, boundary security fencing and security gates, CCTV, landscaping and ancillary works, accessed via two existing accesses along the L62051. The application is accompanied by a Natura Impact Statement (NIS)
The development will consist of land reclamation using inert soil and stones. The proposed works will be subject to a waste facility permit and/or notification under Article 27 of the European Communities (Waste Directive) Regulations 2011, S.I. No. 126 of 2011 for the recovery of c.20,000 tonnes per annum for a period of c. 5 years; not to exceed 100,000 tonnes in total. A temporary wheelwash, portable site office, toilet and holding tank, and other ancillaries will be provided for the duration of the works
Alterations during construction of dwelling to include: (i) Replace conservatory with larger sitting room which incorporates french doors and glazing. To sitting room; (ii) addition of 3 no. rooflights, (iii) and addition of pitched slated roof. (iv) Height of garage windows reduced and removal of arches. In dining area - (v) patio doors replacing 2 no. windows, and (vi) changes to windows with addition of rooflights. (vii) Arch fitted between garage and dwelling, (viii) Removal of front door arch, (ix) Replace timber porch with stone porch. (x) Remove arches from windows. (xi) Relocation of entrance and driveway, (xii) changes to site boundary, (xiii) with connection to existing services, and all associated site works
The development will consist of a new two storey dormer dwelling with garage, septic tank/treatment system, percolation area/polishing filter, new site entrance and all associated site works
A two storey dwelling house, domestic garage, creation of new entrance, private well, domestic wastewater treatment plant and all ancillary site works
The construction of two storey detached dwelling, detached garage, new vehicular entrance gateway with the existing agricultural entrance gate relocated, hedgerow to be set back on either side as necessary, new access road, new wastewater treatment unit and polishing filter, along with all associated services, service connections, landscape and site development works
The brief summarizes the pattern across all 405 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 212214The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief