Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 187 decisions within 5 km, 1 exact-site or onsite candidate record, and 3 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
3 structured nearby appeal records.
3 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(1) the construction of a new light industrial/warehouse unit with attached office accommodation (floor area 2026m2), (2) existing section of road modified to provide vehicular access for cars and small commercial vehicles. Existing entrance modified to provide vehicular access for large commercial vehicles, (3) on-site staff car parking and bicycle parking, (4) 2.0m high security fencing to side and rear boundaries, (5) 1.0m high security fencing to front roadside boundaries, (6) signage on the building, (7) landscaping works, (8) connection to all services and (9) all necessary ancillary site development works to facilitate this development. Significant further information/revised plans submitted on this application
Construction of (1) single storey extension to the rear and sides of existing industrial unit No. 3. (2) connection to existing mains services and all ancillary and enabling site works
The development consists of (a) change of use of section of lands for use as hardware storage yard (b) demolish partially collapsed buildings consisting of 442sqm damaged in fire (c) to construct hardware storage building (c) and complete all ancillary and associated site works. Significant further information/revised plans submitted on this application
The retention of (1) the as-built single storey pitched roof side extension to the existing single storey pitched roof dwelling and (2) the as-built single storey pitched roof rear extension to the existing single storey pitched roof dwelling. The rear extension also part projects to the side of the existing dwelling
(a) Retention of palisade fencing surrounding lands and (b) new recessed entrance into existing lands. (c) Ancillary and associated site works. Significant further information/revised plans submitted on this application
(1) The refurbishment of the existing storey and a half derelict semi-detached house, to include new dormer windows within front roof slope. (2)storey and a half pitched roof rear extension to include new dormer windows within front and rear roof slopes. (3) 2 storey flat roof rear extension to link between the existing house and the storey and a half pitched roof rear extension. (4) 2 storey pitched roof side extension to the existing house to include rooflights within the front and rear roof slopes. (5) Decommission existing septic tank & new waste water treatment plant and percolation area. (6) new vehicular entrance, and (7) connections to all services and all necessary ancillary site development works to facilitate this development.
The brief summarizes the pattern across all 187 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 212221The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief