Free preview / €29 incl. VAT site brief

Site planning risk brief

Fix the brief to an Eircode, a dropped pin or a drawn site boundary. PlanIntel then checks the planning register, available spatial layers, appeals and current indexed policy evidence.
See sample PDF

Define the land to check

Unit 9 Ashbourne Manufacturing Park , Ashbourne , Co MeathOpens secure checkout for the €29 incl. VAT site risk brief. Promotion codes can be entered at checkout.
€29 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelSite risk brief preview

Site planning risk brief

Unit 9 Ashbourne Manufacturing Park , Ashbourne , Co Meath

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

18% of nearby decided applications were refused. The site check found 916 decisions within 5 km, 4 exact-site or onsite candidate records, and 82 structured appeals.

Matched source
212258
Project type
One-off house
Coverage
5 km radius

What this site brief can substantiate today

Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.

Applications tied to the site

Partial coverage

4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.

4 matched

Zoning and settlement

Not yet covered

Current indexed zoning and settlement layers are intersected with the selected site where coverage exists.

Rural-housing policy

Not yet covered

Current section-and-page citations have not yet been loaded for this authority.

Flood, heritage, ecology and archaeology

Not yet covered

Each layer reports its own coverage; missing coverage never appears as a clean result.

Access, road and wastewater prompts

Partial coverage

0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.

Structured appeal history

Confirmed coverage

82 structured nearby appeal records.

82 matched

Current policy citations

Not yet covered

Historic extracted references are not presented as current policy; verified citations are still being loaded.

916Nearby applications
4Site-linked candidates
18%Nearby refused
82Structured appeals

Top refusal reasons nearby

Rural Housing Need9
Wastewater Percolation5
Traffic Sightlines4
Visual Amenity4
Zoning Contravention4

Nearest planning decisions

212258

The change of use from manufacturing use to use for warehouse /distribution/training room and ancillary offices and amenities and use of first floor for religious meetings on Sundays only

Refused0.0 km26 July 2022
AA191388

Change of use from manufacturing to use for social/recreational activities of a religious body

Refused0.0 km11 December 2019
AA190022

Construction of a new roller shutter door to the front elevation of the existing industrial unit and all associated site development works

Granted0.1 km07 March 2019
2460770

Current Use The subject building is used for the storage, cleaning and repair of goods from flood/fire damaged structures The structure comprises offices, mezzanine floor level and warehouse area Proposed Change of use for Mezzanine Level The proposed change of use applies only to the Mezzanine level. It is proposed that the mezzanine level will be used as a Yoga Space which essentially is an open space. It is proposed to provide Yoga Classes in the mezzanine area. Unlike a gym a Yoga space does not use any equipment, except for yoga mats, foam/cork bricks, bolsters (firm cushions), belts and foldable chairs that are stored neatly away 95% of the time. The timetable for the Yoga Space would be mostly evenings. Key times for activities would usually be 6 to 9pm And maybe 1 x1 hour class each morning around 10am All classes are usually Mon-Thurs. So approximately 16 hours a week. There would be possibility of weekend workshop for 2-3 hours, but this would probably be 1-2 sessions per month. The mezzanine floor is spacious enough to hold 4 -12people, but the average class would probably be 6-8 people. Office \ Warehouse Areas The proposed Yoga Space will have no impact upon the office and warehouse areas of the premises. The Yoga space will use the same entrance but will be segregated from the other areas. As the classes will be held predominately outside of the business hours of the remainder of the building then there will be little or no cross over. Water \ Waste Water The proposed Yoga Space would have minimal impact on the use of water at the premises. Parking The proposed Yoga Space would have minimal impact on parking. There are spaces available at the premises and adjacent environs within The Court. Further, activities would be outside the operating hours of adjacent units.

Granted0.1 km13 November 2024
AA190987

Planning permission for retention of the existing unit at this site

Granted0.1 km16 September 2019
AA201488

The construction of a new entrance lobby to the front of an existing industrial unit, for alterations to two existing fire escape doors, and for associated siteworks

Granted0.1 km04 December 2020

The brief summarizes the pattern across all 916 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.

The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.

Exact site history and boundary checks

Site brief

Policy and mapped constraints

Site brief

Appeals and comparable decisions

Site brief

Deterministic risk prompts

Site brief
Ready to get the site risk brief?€29 incl. VAT once-off PDF, no account required