Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
18% of nearby decided applications were refused. The site check found 916 decisions within 5 km, 4 exact-site or onsite candidate records, and 82 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
82 structured nearby appeal records.
82 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The change of use from manufacturing use to use for warehouse /distribution/training room and ancillary offices and amenities and use of first floor for religious meetings on Sundays only
Change of use from manufacturing to use for social/recreational activities of a religious body
Construction of a new roller shutter door to the front elevation of the existing industrial unit and all associated site development works
Current Use The subject building is used for the storage, cleaning and repair of goods from flood/fire damaged structures The structure comprises offices, mezzanine floor level and warehouse area Proposed Change of use for Mezzanine Level The proposed change of use applies only to the Mezzanine level. It is proposed that the mezzanine level will be used as a Yoga Space which essentially is an open space. It is proposed to provide Yoga Classes in the mezzanine area. Unlike a gym a Yoga space does not use any equipment, except for yoga mats, foam/cork bricks, bolsters (firm cushions), belts and foldable chairs that are stored neatly away 95% of the time. The timetable for the Yoga Space would be mostly evenings. Key times for activities would usually be 6 to 9pm And maybe 1 x1 hour class each morning around 10am All classes are usually Mon-Thurs. So approximately 16 hours a week. There would be possibility of weekend workshop for 2-3 hours, but this would probably be 1-2 sessions per month. The mezzanine floor is spacious enough to hold 4 -12people, but the average class would probably be 6-8 people. Office \ Warehouse Areas The proposed Yoga Space will have no impact upon the office and warehouse areas of the premises. The Yoga space will use the same entrance but will be segregated from the other areas. As the classes will be held predominately outside of the business hours of the remainder of the building then there will be little or no cross over. Water \ Waste Water The proposed Yoga Space would have minimal impact on the use of water at the premises. Parking The proposed Yoga Space would have minimal impact on parking. There are spaces available at the premises and adjacent environs within The Court. Further, activities would be outside the operating hours of adjacent units.
Planning permission for retention of the existing unit at this site
The construction of a new entrance lobby to the front of an existing industrial unit, for alterations to two existing fire escape doors, and for associated siteworks
The brief summarizes the pattern across all 916 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 212258The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.