Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 522 decisions within 5 km, 1 exact-site or onsite candidate record, and 26 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
26 structured nearby appeal records.
26 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The construction of a single storey dwelling, detached domestic garage, a domestic wastewater disposal system, the permanent closure and relocation of neighbouring site entrance to create new shared site entrance and all associated site works. Significant Further information/Revised plans submitted on this application
A single storey extension to gable of their dwelling house on site. Significant further information/revised plans submitted on this application
Planning retention to retain domestic garage and retain outbuildings used for domestic storage, boiler and a personal gym on site
Permission to amend the design of the approved development (Planning Reference TA/180167) which comprises consent for a Solar PV Energy Development. Proposed amendments include; (1) Customer Substation to be relocated and decrease in size, (2) Number of Inverters to be reduced, (3) 1no Inverter to decrease in size, (4) Minor changes to the panel layout, (5) Slight alteration to the access tracks, (6) Battery Containers to be removed, (7) Slight alteration to the layout of the Deer Fencing and (8) Project Lifetime proposed to be extended from 30 to 35 years
A new entrance off the Kinnegad Road, the construction of thirty two housing units, comprising twenty nine two storey houses, four pairs of semi-detached houses, five terraces comprising three, four and six units and three apartments in a three storey block, an access roadway to the GI Community Infrastructure Lands to the south, connection to public services and all associated site works. A Screening for Appropriate Assessment is included in the application. Significant further information/revised plans submitted on this application
The development will consist of solar PV arrays with a surface area of approximately 31,000m2 mounted on steel support structures, associated underground cabling and ducting, grid control building, 2 No. inverter/transformer cabins, 2 no. battery enclosures, site entrance, access tracks, hardstanding area, boundary security fence, CCTV, landscaping and ancillary works. The solar PV arrays will have a height above ground level of up to 3m and an export electrical capacity of up to 4 megawatts. An appropriate period of 10 years (i.e. duration of the planning permission to construct the development) is sought, with an operational life of 25 years after that date of commissioning
The brief summarizes the pattern across all 522 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 212323The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief