Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 1,461 decisions within 5 km, 4 exact-site or onsite candidate records, and 122 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
122 structured nearby appeal records.
122 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The provision of additional temporary post primary school accommodation, by way of construction of seven prefabricated buildings with associated site works including, boundary treatments, vehicular parking, bicycle parking, wastewater treatment system and associated percolation area. Temporary permission for a period no longer than 5 years is being sought. Significant further information/revised plans submitted on this application
The provision of a temporary post primary school by way of construction of 3no. prefabricated buildings (c 190 Sq. Mtrs 239 Sq. Mtrs & 469 Sq.Mtrs) on a defined site area (c. 0.643Ha) to be enclosed within a 2mtrs high welded mesh fencing and access gates with associated site works including provision of new site entrance onto new road as granted planning permission under Planning Ref LB 180620, short term temporary entrance onto Mill Road, car parking, drop off area and hard surface play area, wastewater treatment system and associated percolation area. Temporary permission for a period no longer than 5 years is being sought
The proposed development includes the removal of interim accommodation permitted under Ref. No. LB190739 and Ref. 21/2336, and the construction of a new, 1,000 no pupil post-primary school (Roll No. 68348A), which will comprise of 43 no. classrooms, with associated laboratories and specialist classrooms, Multi-Purpose Hall, a Physical Education Suite including a Physical Education Hall, and all ancillary teacher and pupil facilities with a gross floor area of c. 11,302 sqm over 3 no. storeys. The proposal includes the removal of all interim accommodation on site, arranged across 12 no. blocks, with a cumulative GFA of c.4,203sq m (previously permitted under Reg. Ref. LB190739 and Reg. Ref. 21/2336) including the removal of 1 no. interim accommodation block, constructed under exempted development (c.249 sq m). The proposal also includes the demolition of a single-storey c. 190 sqm derelict building, associated with the former agricultural use of the site. Vehicular access to the subject site is proposed via a new priority-controlled T-junction located on the new link road to the southwest of the site, with associated tie-in works to the existing road network; 2 no. pedestrian and cyclist access points and 2 no. pedestrian only access points to the southwest boundary of the site; staff and visitor parking spaces and designated drop-off and set down facilities. The development will also include the provision of 1 no. external storage building (c.50 sqm); 1 no. bin store; bicycle and scooter parking; vehicle and bus drop off/set down areas; internal access roads; hard and soft play areas including 6 no. hard play court areas; piped infrastructure and ducting; plant and plant room; LPG Tanks Compound; electrical switch room; landscaping and boundary treatments; PV panels; EV parking facilities; external courtyards; disabled car parking spaces; site clearance works, comprising of the partial removal of hedgerows and a number of trees; stepped access routes; street and security lighting; signage; 2 no. attenuation tanks; surface water drainage and SUDs measures (including green roof provision); 5 no. flagpoles; piped infrastructural services and connections, hard and soft landscaping, ESB Substation, changes in level and all associated site development and excavation works above and below ground. The total site area is 5.26Ha. Significant further information/revised plans submitted on this application
Planning permission for an agricultural entrance to my land from the public road at Mill Road, Colpe, Co. Meath. The work will include the ancillary site development works
The development consists/will consist of 1) retention of existing single storey side extension as constructed & 2) proposed bay window to front elevation, enclosure of existing front porch, single storey side & rear extensions with new effluent treatment system and percolation area to replace existing septic tank (to be removed) and all associated works
The proposed development will consist of the demolition of the existing habitable house and construction of 1 no. 4 storey office building consisting of 2 no. blocks with a shared corner entrance/reception area and a screened plant area, solar panels and equipment at roof level, providing a total GFA of 11,205 sq.m. The proposed road infrastructure includes a link street approximately 720m in length, including 3 no. roundabout junctions, and it is also proposed to extend a 230m long spur of the link street to the east to facilitate a connection to the existing school on Mill Road (Gaelscoil an Bhradain Feasa). The road infrastructure also includes the realignment of a section of Colpe Road and the realignment of the southern section of Mill Road, and includes proposed cycle lanes/paths access road to the commercial development and associated car park, footpaths, grass verge, public lighting and the provision of a footpath and cyclepath/cycle lane on Colpe Road to tie-in with the existing shared footpath/cyclepath, to the south-west of the railway line. The associated site and infrastructural works include the demolition of the existing habitable house and associated structures, provision of foul water drainage, surface water drainage including surface water storage facilities above and below ground, watermains and utilities, 280 no. total car parking spaces, including 6 no. disabled parking spaces, 93 no. cycle parking spaces, landscaping consisting of new tree planting, hedges, berms and grass planting, public lighting, bin stores, boundary walls and fences, cyclepaths and footpaths, EBS substation and switchroom, gas skid, pump house, and all associated site and infrastructural works on an application site area of c. 8.07 hectares
The brief summarizes the pattern across all 1,461 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 212336The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief