Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
17% of nearby decided applications were refused. The site check found 397 decisions within 5 km, 2 exact-site or onsite candidate records, and 19 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched1 of 2 layers are loaded for Meath County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedOne current citation from the Meath County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Meath County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
19 structured nearby appeal records.
19 matchedCitations are current-dated and carry policy name, section, page and source URL from the Meath County Council development plan.
1 matchedOpen preview
Open preview
Proposed erection of an agricultural biogas renewable energy facility, consisting of 3 no. primary digester tanks, 2 no. post digestor tanks with integrated concrete link pump-room, containerised pasteurization unit with auxiliary tanks, 1 no. emergency flare with base and security fencing, 3 no. agricultural solid feeders with associated concrete bases, 2 no. underground pre-reception tanks, 2 no. covered agricultural digestate storage tanks, 2 no. containerised gas CHP units with concrete bases, 1 no. site office/control building with associated staff car parking area and waste water treatment tank and eco-flow coco filter, 1 no. containerised biogas upgrading treatment system and associated hardstanding, 1 no. electric transformer and sub-station with associated hard standing and security fence, erection of covered agricultural storage building with internal clamp areas and center access passage, erection of nutrient recovery system building with 2 no. nutrient recovery systems with ancillary tanks and equipment, erection of 4 no. ASS double bunded storage tanks with concrete bases, erection of digestate drying and pelletising building, erection of pellet storage building with internal racking system, erection of underground agricultural weighbridge, erection of boundary earth bunded area and landscaping, relocation of existing agricultural access laneway, provision of new hardstanding access laneway, proposed upgrade of existing access arrangement and junction improvement works, proposed erection of street lighting columns with security camera provision, new internal drainage system with underground interceptor/storage tanks and rainwater collection tank, proposed laying of underground gas pipe line (3.4Km) to gas grid connection point, ancillary site works and new boundary fencing and landscaping scheme. Significant further information/revised plans submitted on this application.
Development will consist of (1) Construction of a detached single storey farm office/agricultural storage building incorporating office area, sanitary accommodation, chemical and medicine storage areas, (2) Installation of a septic tank and percolation area, (3) Completion of all ancillary site works and associated structures
A. Construction of new straw bedded calving shed B. Construction of new cubicle shed with underground slatted storage tank C. Construction of silage pit and dungstead, and all associated site works. Significant further information/revised plans submitted on this application
A) Retention permission for an existing silage pit and dungstead. b) Permission to construct straw bedded calving shed. c) Permission to construct cubicle shed with underground slatted storage tank. d) Permission to upgrade existing farm entrance and all associated site works. Significant further information/revised plans submitted on this application
The development will consist of 1 no. 2 bed seasonal accommodation unit for farm labourers together with new proprietary waste water treatment system and sand polishing filter. The development also includes blocking up of existing unauthorized entrance and using existing entrance to dwelling to access new accommodation and all associated site works
The development will consist of 1 no. 2 bed seasonal accommodation unit for farm labourers together with new proprietary waste water treatment system and sand polishing filter. The development also includes the upgrade of existing entrance and all associated site works
The brief summarizes the pattern across all 397 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 212347The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief