Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 187 decisions within 5 km, 1 exact-site or onsite candidate record, and 2 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2 structured nearby appeal records.
2 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The construction of a two storey dwelling house, detached domestic garage, proprietary wastewater treatment system, new entry to public road and all associated site works
To construct a dry-bedded shed for the housing of livestock, along with associated ancillary site works, within existing farmyard complex
(1) to construct a two storied type dwelling house and a detached garage, (2) to install a proprietary waste water treatment unit and percolation area, (3) to make a new entrance onto the road, with entrance walls, gates and piers, (4) all ancillary site development works
A two storey style dwelling, domestic garage, advanced waste water treatment system and percolation area, new entrance walls and piers and all ancillary site development works. Significant further information/revised plans submitted on this application
Construction of a new forest road entrance and associated site works for the purposes of harvesting a plantation
The development consists of the following (1) to construct a single storied dwelling house and a detached domestic garage (2) to install a proprietary waste water treatment unit and percolation area (3) to make a new entrance onto the road to serve the new development (4) and complete all ancillary site development works. Significant further information/revised plans submitted on this application
The brief summarizes the pattern across all 187 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 212355The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief